A string of Chicago bids is still one remote read per set
Support for a contractor who bids often in Chicago is a sequence of document reviews, not a desk in the Department of Buildings. Each invitation can sit on a different side of Code Memorandum 2026-001. Applications started on or after 1 December 2026 must use the 2026 mechanical, fuel-gas, and energy titles and the related building-code amendments. Applications started earlier may still be on the prior texts unless the applicant opted in. The assumption log for bid three does not copy the code year from bid one. Title 14E, the electrical code based on the 2017 NEC, was not replaced by that memorandum. Electrical scope keeps that fact even when the mechanical book moves.
Cost Estimators across Chicago-Naperville-Elgin average $43.76 an hour in the May 2025 file, series OEUM001698000000013105103. That is the estimating occupation. It is not the ironworker and not the pipefitter. Trade labor, when the estimate is priced, comes from the rates you provide or from the public wage schedule the contract attaches. Illinois shows no dollar minimum on the January 2023 prevailing-wage chart. A private loop renovation does not pick up a public classification because yesterday’s bid was a school.
Deliverables follow your spreadsheet. Alternates stay broken out. Allowances are transcribed at the amount the bid form prints. Two bids for the same client with different owners still get separate general-requirements sheets. A missing structural set on one bid is a gap for that bid only. It does not stop the interior bid that arrived complete. Addenda are logged by number and date. A revised page replaces the prior quantity for that sheet and the delta is kept if you want revision tracking. General requirements use the duration on that invitation. They are not a percent of the trade total copied from a different project. Insurance and bond lines are included only when division 01 or the bid form asks for them. A missing structural set blocks the foundation price on that bid alone. It does not stop a different interior bid that arrived complete. Addenda are logged by number. Revised pages replace the prior quantity for that sheet, and the delta is kept when you want revision tracking.
There is no trailer and no expediter role. Send the list, the dates, and the current issue of each set. The quote for the support names which bids are included and what it costs.
Ongoing estimating support described without this city’s code calendar
Chicago bid-list habits that cause bad assumptions
Will one code year be used for every bid received this month?
No. The memorandum’s 1 December 2026 line means two bids in the same week can be on different mechanical and energy texts. Record the election on each.
Does Title 14E move to a newer NEC with the 2026 ordinance?
The memorandum updates mechanical, fuel gas, energy, and parts of the building and rehabilitation titles. It does not replace the electrical title, which adopts the 2017 NEC.
Is the estimator a Chicago employee?
No. The work is remote, limited to the files and the quote. There is no seat at the Department of Buildings.