F&K Estimatings Construction Estimating & Takeoffs

West Virginia State Fire Commission

West Virginia Construction Estimates for Earthwork and Retaining Walls

F&K estimates West Virginia work from the drawings you send. There is no West Virginia office, no site walk, and no permit filing.

The 2018 West Virginia State Building Code, effective 1 August 2022, is the 2018 IBC and 2018 IRC with state exceptions, and it is in force only where a county or city adopts it. A jurisdiction that has not adopted it is not secretly reviewing the 2018 IRC. Ask before you treat a detail as a code minimum.

Zones 4 and 5, cold snowy winters at elevation, steep sites, and karst in the eastern counties are the construction conditions. Moderate frost is the usual footing note, deeper in practice where elevation demands it and the local rule says so. Steep-site access and shoring are means and methods the drawings either show or leave open.

The DOL chart of January 1, 2023 records the May 2016 repeal of the prevailing-wage statute. There is no state scale to insert. The Contractor Licensing Board licenses contractors. Estimating is remote.

Procurement and labor notes for West Virginia

West Virginia estimating inputs should be taken from the awarding agency's current drawings, specifications, bid forms, addenda, and project funding requirements. Confirm the applicable code and labor clauses from the project documents.

West Virginia state purchasing and agency bid documents control construction procurement assumptions. Use the current solicitation and issued amendments rather than assuming one process applies to every public owner.

Labor assumptions should follow the specific contract and funding source, including any federal wage determination or project-specific public-work clause. This page does not assign a universal statewide prevailing-wage basis.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

Sitework estimating

For a steep West Virginia site, use cross-sections to define benching, cut limits and backfill around retaining structures. Keep documented shoring and haul access assumptions visible in the estimate where the tender assigns them.

Concrete takeoff

For a West Virginia retaining-wall package, reconcile wall heights and footing steps against site elevations. Measure concrete, reinforcement, drainage and formed surface separately so sitework and structural bidders can agree their scope boundary.

What to send and what to request

Bid drawings and inputs
Survey contours, grading and retaining sections, geotechnical data, equipment access plan.
Estimate deliverable
Earthwork by material, retaining concrete and drain quantities, haul or rock allowance register.
Request an estimate for a West Virginia project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a West Virginia project, share your bid documents so we can confirm which items belong in the quote.

West Virginia questions before a number is issued

Is the West Virginia building code automatic in every county?

No. It applies where the county or city has adopted it. The 2018 edition effective 1 August 2022 is the version available to adopt, not a guarantee that this parcel is under it.

Did West Virginia repeal prevailing wage?

Yes. The DOL table dated January 1, 2023 records a May 2016 repeal. Federal Davis-Bacon can still be in an assisted contract.

Official references for West Virginia

Compare a marked-up quantity sheet in the sample library before sending a set.