Wisconsin Department of Safety and Professional Services
Wisconsin Construction Estimates for Roofs and Foundations
F&K estimates Wisconsin work from the drawings you send. There is no Wisconsin office, no site walk, and no permit filing.
Wisconsin’s commercial building code, SPS 361 to 366, is based on the 2021 I-Codes and took effect 1 September 2025. Plans submitted from 1 November 2025 had to meet that book. One- and two-family homes do not use that IBC adoption. They follow the state-written Uniform Dwelling Code, SPS 320 to 325. Municipalities with delegated authority issue many permits; elsewhere the state does.
Zones 6 and 7, deep frost, heavy snow, and lake-effect snow near Lake Superior and Lake Michigan are the winter quantities: footing depth, roof load, and a short exterior season. A Milwaukee detail is still not a Bayfield detail.
The DOL chart of January 1, 2023 records the 2017 repeal. State prevailing wage on state building projects ended for projects advertised after 23 September 2017. Davis-Bacon was not repealed by that budget act. F&K has no Wisconsin office.
Procurement and labor notes for Wisconsin
Wisconsin construction estimates should distinguish current state procurement documents, federal funding, and the project construction type. State prevailing-wage requirements changed historically, so current bid documents and funding controls are essential.
The Wisconsin Department of Administration administers state procurement and publishes state construction and facilities resources. Use the current project manual, plans, specifications, bid forms, and addenda.
Wisconsin's state prevailing-wage requirements were repealed for newer state projects, while federal Davis-Bacon requirements can still apply to federally funded or assisted construction. Confirm the project funding and current wage decision.
Estimating services and trade scopes
Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.
Roofing takeoff
For a Wisconsin reroof with multiple snow and drainage zones shown on the set, use plan areas and roof sections to separate tapered insulation, curbs and flashing. Price specified temporary protection by work phase.
Concrete takeoff
For a Wisconsin slab and footing bid, identify heated and unheated areas where insulation and foundation sections differ. Track foundation walls, thickened edges and winter placing measures separately from the slab volume.
What to send and what to request
- Bid drawings and inputs
- Roof sections, deck conditions, geotechnical recommendations, slab details and phasing notes.
- Estimate deliverable
- Roof layer and perimeter schedule plus concrete quantities with separate cold-weather allowances.
Browse estimating services and trades
Find the drawings, quantities and deliverables for your scope. For a Wisconsin project, share your bid documents so we can confirm which items belong in the quote.
Estimating services
- Construction Estimating
- Cost Estimating
- Quantity Takeoff
- Dedicated Estimator
- Commercial Estimating
- Residential Estimating
- Industrial Estimating
- Multi-Family Estimating
- Bid Consultation
- Project Management
- Quantity Surveyor
- Bid Management
- Material Procurement
- Plan Review
- Subcontractor Takeoff
- Institutional Estimating
- Value Engineering
Trade estimating and takeoffs
- Concrete Estimating
- Masonry Estimating
- Structural Steel
- Lumber Takeoffs
- Drywall Estimating
- Painting Estimating
- Flooring Estimating
- Roofing Estimating
- Insulation Estimating
- Doors & Windows Estimating
- Millwork Estimating
- MEP Estimating
- Electrical Estimating
- Plumbing Estimating
- HVAC Estimating
- Sitework Estimating
- Demolition Estimating
- Landscaping Estimating
- Fireproofing Estimating
- Waterproofing Estimating
- Metals Estimating
- Thermal & Moisture Protection
Wisconsin questions before a number is issued
Does the 2021 commercial code apply to a Wisconsin duplex?
No. One- and two-family homes follow the Uniform Dwelling Code. The 2021-based commercial code covers commercial and multifamily buildings under SPS 361 to 366.
Is there still a Wisconsin state prevailing wage?
Not for state building projects bid after the 2017 repeal recorded by DOL. Federal Davis-Bacon requirements were not removed.
Official references for Wisconsin
- Wisconsin Department of Safety and Professional Services
- DOL state prevailing-wage thresholds (January 1, 2023)
- Wisconsin State Procurement
- Wisconsin Prevailing Wage Overview
- Wisconsin State Building Program
Compare a marked-up quantity sheet in the sample library before sending a set.