F&K Estimatings Construction Estimating & Takeoffs

North Dakota Department of Commerce, Division of Community Services

North Dakota Construction Estimates for Foundations and Insulation

F&K estimates North Dakota work from the drawings you send. There is no North Dakota office, no site walk, and no permit filing.

The 2024 North Dakota State Building Code, effective 1 January 2026, is the 2024 IBC and 2024 IRC with state amendments, and it applies to cities and counties that choose to enforce a building code. It is not a claim that every township runs a permit counter. Energy provisions can follow the amended residential chapter or the 2024 IECC, as the adoption allows.

Zones 6 and 7, very cold winters, deep frost, wind, and expansive clay are the site facts that move footing depth, insulation, and foundation type when the drawings and the geotech agree. A short exterior season is a schedule assumption, not a quantity.

DOL’s January 2023 chart shows no North Dakota prevailing-wage statute. Davis-Bacon is a federal-funding clause. No state sales-tax exception is claimed here. The takeoff is done off site from your files.

Procurement and labor notes for North Dakota

North Dakota has a state building-code framework with local code-enforcement information. Estimates should identify the adopted code edition, project location, and responsible enforcement jurisdiction from the project documents.

North Dakota agency procurement requirements and bid documents control project scope, forms, addenda, and award conditions. Use the current public-owner package rather than assuming one agency process applies statewide.

Labor assumptions should follow the project contract and funding source. Where federal assistance or a specified public-work wage requirement applies, use the current determination in the bid documents; do not assume a universal state wage rate.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

Concrete takeoff

For a North Dakota structure with heated and unheated areas, measure frost-protection details and footing depths by condition. Label cold-weather measures from the bid instructions separately so bidders can compare the same construction schedule.

Insulation takeoff

For a North Dakota warehouse, reconcile wall and roof insulation quantities with dock, base and parapet details. Keep thermal breaks and transition treatments on separate lines when the drawings assign them to the enclosure package.

What to send and what to request

Bid drawings and inputs
Geotechnical recommendations, foundation and thermal details, phasing and site design criteria.
Estimate deliverable
Concrete, reinforcement and insulation schedule with winter or soil allowances called out.
Request an estimate for a North Dakota project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a North Dakota project, share your bid documents so we can confirm which items belong in the quote.

North Dakota questions before a number is issued

If a North Dakota city does not enforce a building code, which edition is the estimate under?

Do not invent one. The 2024 state code is for jurisdictions that enforce a code. Ask what standard the designer used and write that as an assumption.

Is deep frost a reason to add extra footing concrete on every bid?

Only to the depth the code and the drawings require for that site. Measure that depth. Do not add a second allowance on top.

Official references for North Dakota

Compare a marked-up quantity sheet in the sample library before sending a set.