F&K Estimatings Construction Estimating & Takeoffs

Ohio Board of Building Standards

Ohio Construction Estimates for HVAC Retrofits and Roofs

F&K estimates Ohio work from the drawings you send. There is no Ohio office, no site walk, and no permit filing.

The 2024 Ohio Building Code, based on the 2021 IBC, took effect 1 March 2024 for commercial work. One-, two-, and three-family homes follow the 2019 Residential Code of Ohio, based on the 2018 IRC. Quoting a single “Ohio I-Code year” will be wrong for one of those two volumes. The Board of Building Standards is the publisher; certified local building departments do the reviews.

Zones 4 and 5, lake-effect snow in the northeast, freeze-thaw, and severe storms are the climate. Moderate frost depth sets footings. Do not treat a Lake County snow load as a Cincinnati number.

The DOL chart of January 1, 2023 lists $250,000 for new construction and $75,000 for remodeling, notes school-construction exemptions, and says road and bridge thresholds are adjusted on a separate schedule. Those figures move. Use the solicitation’s current threshold and the wage schedule, not a remembered number. Estimating stays remote.

Procurement and labor notes for Ohio

Ohio public-improvement estimating should identify the locality, public authority, work classification, and applicable wage schedule before labor pricing is finalized.

Ohio law requires applicable prevailing-wage schedules to be attached to specifications and bidding blanks for covered public improvements. Use the current public-owner solicitation, plans, specifications, forms, and addenda.

Ohio's prevailing-wage schedules are determined for the locality and class of work. The current Ohio portal and project documents should control labor assumptions; federal funding may introduce additional requirements.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

HVAC estimating

For an Ohio industrial retrofit, separate air-handling equipment, distribution changes and controls points from the retained system. Use the issued sequence and downtime restrictions to clarify which shutdown and start-up tasks belong in the quote.

Roofing takeoff

For a northeast Ohio roof replacement with drift or drainage details, divide quantities at changes in roof level and insulation taper. Keep drains, overflow details, curbs and temporary weather protection visible in the bid workbook.

What to send and what to request

Bid drawings and inputs
Mechanical schedule, roof plan and warranty details, power and controls notes, lift and shutdown instructions.
Estimate deliverable
Equipment, curb and flashing quantities, interface matrix and separate crane allowance.
Request an estimate for a Ohio project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a Ohio project, share your bid documents so we can confirm which items belong in the quote.

Ohio questions before a number is issued

Does the 2024 Ohio Building Code cover a single-family house?

No. Houses follow the 2019 Residential Code of Ohio. The 2024 book is the commercial code effective 1 March 2024.

Are Ohio prevailing-wage thresholds fixed forever?

No. The January 2023 DOL footnote says the commerce director adjusts them on the statutory cycle, and road work uses different figures. Read the current bid notice.

Official references for Ohio

Compare a marked-up quantity sheet in the sample library before sending a set.