Equipment schedule · Duct as drawn · No invented tons
Charlotte mechanical counts come from the equipment schedule, and a humid summer does not add a unit the schedule omitted
Charlotte mechanical quantities are tag counts and duct measures, not a humidity adder. The Office of the State Fire Marshal still lists the 2018 North Carolina code, effective 1 January 2019, as the book in force. Do not price a 2024 coil or control package as if plan review had switched. Record the edition the drawings name. A Concord or South Carolina cover is a different authority and stays out of this total.
Packaged rooftop pieces, split systems, and fans are separate each-counts from the equipment list. Relief air is not cooling capacity. Sheet-metal mains are squared or weighed from the duct layout that was issued. Flexible branches are lengths only where the plan marks flex. Grilles are each. Refrigerant runs are lengths by size from the piping diagram. Controls stay blank until a points list arrives.
Heating, Air Conditioning, and Refrigeration Mechanics and Installers are published at $28.82 on OEUM001674000000049902103. The survey is Charlotte-Concord-Gastonia, NC-SC. The occupation is the mechanic. It is not tons of cooling and not a pound of metal. Sheet-metal workers are a different occupation. The January 2023 chart does not list a North Carolina prevailing-wage law for a private building.
Hood exhaust is taken from the hood sheets and kept apart from comfort duct. Makeup air for that hood is its own mark when the list tags it. A flue is not comfort heat. Condensate piping is linear. A curb under a unit is flagged so the roof trade is not also charged for buying it. Balance work is included only if you ask for that line.
If an energy form and the equipment list disagree, both are logged and neither is silently edited. What you receive is the tag counts, the duct measures, the 2018-code note, and the gaps. The general method for organizing a mechanical takeoff is on the national page.
VAV boxes on a Charlotte office floor are each by mark. A laboratory exhaust fan is not a toilet fan. Fan-coils in a hotel wing are one per room on the typical bay, extended by the bay count. A boiler and its pumps are a plant group, not a rooftop piece. Perimeter fin-tube is linear by element.
A Charlotte rooftop unit is one each from the schedule, and the curb under it is flagged so the roof trade is not also buying the curb. Exhaust fans serving toilets are not laboratory exhaust. A dedicated outside-air unit is its own mark. Variable-air boxes are each by the mark on the floor plan, not a percentage of floor area. Perimeter fin-tube is linear by the element the plan draws. A boiler plant is the boiler, the pumps, and the flues the mechanical sheets show, kept off the rooftop count. Test and balance is included only when you ask for it. A Concord mechanical sheet is excluded from the Charlotte extension. Duct mains are taken from the issued layout as area or weight, whichever the layout supports, and a missing layout leaves duct unresolved rather than estimated from tonnage.
Mechanical quantities before adding tons for Charlotte humidity
Charlotte mechanical bid questions
Will you add tonnage because Charlotte summers are humid?
No. Capacities and counts come from the equipment list. A tag that was never issued stays off the sheet.
Should this bid use the 2024 mechanical code?
Not from the state current-codes page. That page still lists the 2018 code. The estimate uses the edition named on the drawings.
Is $28.82 a price per ton?
No. OEUM001674000000049902103 is the hourly statistic for Heating, Air Conditioning, and Refrigeration Mechanics and Installers.