One log per bid · January 1, 2026 filing rule · Remote
A San Diego bid list is not one counter just because the wage survey uses one metro name
A running list of San Diego invitations is handled off site. This service is not a seat in a local office. Every invitation is recorded on its own sheet: the city printed on the cover, the edition that cover cites, and the PDFs that actually arrived. Inside the city the reviewer is the Development Services Department. Chula Vista, Carlsbad, and county land outside the city use other counters. A shared wage-survey label does not merge those counters.
For a city parcel, applications submitted on or after January 1, 2026 are under the 2025 California Building Standards Code. The department’s notice names the building, residential, fire, mechanical, plumbing, electrical, energy, historical, green, existing-building, wildland-urban interface, and referenced-standards volumes in that package. Local amendments in ordinance O-22080 took effect April 22, 2026. A set prepared for a 2022 filing is not silently upgraded. The log writes the edition the drawings use.
File OEUM004174000000013105103 places Cost Estimators at $46 an hour. The geography on that file is San Diego-Chula Vista-Carlsbad. The occupation estimates. It is not a wireman and it is not an ironworker. Dollars in a trade column, when you want them, come from rates you hand over or from a determination attached to a covered public set. Billing for the estimate is its own quote.
A school or community-college set can move to the Division of the State Architect even when the mailing address says San Diego. A hospital set can move to HCAI. Those paths are named only when the invitation names them. A private clinic is not given a hospital review path because the last bid on the list was a hospital.
Mapped interface rules are used only where these drawings put the parcel. A downtown interior build-out does not receive them. Add-alternates sit on separate pages. Any contingency figure is one you choose.
Forward the bid list and the first plan set. No pre-bid walk is attended.
A bid that mixes a bay-front podium with an inland warehouse gets two logs even when one contractor is pricing both. Special inspection hours are a general-requirement allowance you set, not a line this workbook invents from the city name. Deferred submittals are named and left unmeasured until those sheets exist. The fourth-extension warning in the department notice is a filing fact, not a quantity.
Bid support before treating the San Diego metro as one counter
San Diego bid-list questions that stay on the log
Will every metro bid use San Diego’s April 22 amendments?
No. Those amendments belong to the city. A neighbor that only shares the wage survey writes its own local changes.
Do you attend the city intake meeting?
No. The work is a remote reading of the documents you send.
Is $46 the fee?
No. File OEUM004174000000013105103 is what BLS published for Cost Estimators. Billing for this support is quoted from the document list.