2026 NEC · Unamended · Lighting from the plan
Denver electrical quantities follow the 2026 code the city says it enforces unamended, the same edition as the state
Electrical work inside Denver is reviewed by Community Planning and Development. The city page says Denver adopts and enforces the 2026 National Electrical Code unamended, and that it is the same edition the state adopted. A drawing set that names an older year is flagged. It is not rewritten in the dark. The page used here does not describe a transition window, so this workbook does not invent one. The energy code remaining on the 2021 edition is a separate book from this electrical edition.
Gear, feeders, and branch circuits stay apart. Fixtures are counts by type from the lighting plan. An interior lighting compliance report, when the energy sheets include one, is a submittal. It does not replace the symbol count. Devices come from the power plan. Conduit is extended only where a size and a route are shown. A panel schedule that fights the one-line is reported.
Series OEUM001974000000047211103 records Electricians at $32.50 for Denver-Aurora-Centennial. Aurora is in the figure and is not this office. The statistic is not a conduit price. A private fit-out does not inherit the state prevailing-wage line. That line is state-funded work over $500,000 on the January 2023 chart, with CDOT excluded from the statute.
Photovoltaic equipment is a count from the sheets that show it, whether or not a city policy PDF discusses solar permits. Vehicle-charging spaces are counts from the garage plan. Fire alarm stays out of a power-only bid. A generator and its feeder are a separate group. Temporary power is a means line only if you ask for it.
Snow-melt circuits in a drive or a walk are linear or area as the electrical plan shows them. They are not added because Denver gets snow. Site poles are counts. Underground duct is linear from the site section. Controls are counts from a diagram. No diagram leaves them open.
An Aurora one-line is not extended as a Denver 2026 set. The cover names the city.
Upload the one-line, the panel schedules, and the lighting plan. No gear is opened.
A photovoltaic canopy over parking is module counts plus the steel note that it is not conduit. EV fast-charger cabinets are pieces from the site plan. Heat-trace on a roof drain leader is linear only where the electrical plan draws the circuit.
Electrical quantities before rewriting a Denver set onto a different NEC year
Denver electrical questions the 2026 adoption creates
Is the Denver electrical code amended?
The city page says the 2026 NEC is adopted unamended and matches the state edition. A set that names a different year is flagged rather than converted.
Does the lighting energy report replace the fixture count?
No. Fixtures come from the lighting plan. The report is a submittal, not the count.
Is $32.50 a conduit price?
No. Series OEUM001974000000047211103 is the survey hourly statistic for Electricians.