San Jose, California · Remote estimating support
San Jose estimating for site surfaces and stormwater interfaces
A San Jose redevelopment estimate needs a consistent surface-area register before civil, landscape and stormwater scopes are combined. New paving, removed paving and retained surfaces are different quantities. We use the project's drainage and landscape drawings to avoid double-counting the same footprint under both demolition and new work.
Send plans for a scope quoteProject context and local references
San Jose's planning department publishes stormwater-management forms and measures for new development and redevelopment under Provision C.3. The designer identifies the applicable requirements and treatment design. An estimator should trace the supplied area classifications and details, rather than treating every disturbed square foot as a new treatment facility.
Reconcile surface areas before measuring treatment assemblies
Hypothetical worked example · not a client project or market quotation
Consider a 3,200-square-foot paved area where 2,100 square feet are removed. Of that removed footprint, 1,700 square feet become new pavement and 400 square feet become a specified landscaped treatment area; 1,100 square feet of original pavement remain. The register balances: 1,700 + 400 + 1,100 = 3,200. Demolition is 2,100 square feet, not 3,200. The 400-square-foot treatment footprint still needs the drawn media depth, underdrain, structures and planting; its area alone is not a complete stormwater-system takeoff.
Review before pricing
Check the distinction between disturbed area, impervious area and actual construction quantities. Match grading limits and treatment details to the same design issue. Where a system includes multiple layers, measure their volumes from specified depths without inventing an infiltration design. Record whether maintenance access, testing and establishment work belong to the contractor's scope.
Documents and requested output
Send the existing and proposed surface plans, drainage calculations supplied by the engineer, treatment sections, landscape schedule and demolition limits. Request a reconciled area sheet with separate demolition, retained and new columns, followed by assembly quantities. Flag inconsistent boundaries before pricing; a balanced area schedule is a useful coordination check but does not certify stormwater compliance.
What to confirm before comparing bids
Ask bidders whether their treatment price includes the complete specified assembly or only excavation and planting. Compare quantities by component rather than by one undifferentiated site-area rate.
Scope checklist
- Balance removed, retained and proposed surface areas.
- Use the engineer’s treatment sections for layer quantities.
- Separate assembly installation from establishment and maintenance scope.
Source documents for project review
Local references checked . Confirm the current requirements with the project team and relevant authority.
Questions for this estimating scope
What information helps us reconcile surface areas before measuring treatment assemblies?
Send the existing and proposed surface plans, drainage calculations supplied by the engineer, treatment sections, landscape schedule and demolition limits. Request a reconciled area sheet with separate demolition, retained and new columns, followed by assembly quantities. Flag inconsistent boundaries before pricing; a balanced area schedule is a useful coordination check but does not certify stormwater compliance.
What needs review before this scope is priced?
Check the distinction between disturbed area, impervious area and actual construction quantities. Match grading limits and treatment details to the same design issue. Where a system includes multiple layers, measure their volumes from specified depths without inventing an infiltration design. Record whether maintenance access, testing and establishment work belong to the contractor's scope.