8th Edition FBC · Building Inspection Division · Not HVHZ
Jacksonville concrete follows the 8th Edition Florida Building Code, and Duval County is not a high-velocity hurricane zone
Concrete inside Jacksonville is reviewed by the Building Inspection Division. The division’s code list names the Florida Building Code, 8th Edition (2023), for the building and residential volumes. The statewide edition became effective on 31 December 2023. Duval County is not Miami-Dade and not Broward, so the high-velocity hurricane zone fastening regime is not this city’s default. Wind design that the structural notes actually print is still counted. The absence of that zone is not permission to ignore a tie-down the foundation plan shows.
Footings, grade beams, slabs, walls, and columns are cubic yards taken from the sizes printed here. Bar steel is totaled by size. Anchor bolts and straps cast into the concrete are counts from the foundation plan. A high water table or a limestone void becomes a quantity only when this project’s geotechnical report says the excavator will meet it. A silent report leaves that condition open. Frost is not the reason a Jacksonville footing is deep.
Paving, sidewalks, and a slab on grade for the building stay in separate groups. Site concrete is omitted when the civil sheets are not in the invitation. Site-cast panels, when panel drawings exist, stay out of the floor total.
Cement Masons and Concrete Finishers in the Jacksonville wage area are published at $24.25 an hour on file OEUM002726000000047205103. The figure is not a yard price. Florida’s state chart does not list a prevailing-wage statute. A federally assisted contract can still attach its own determination. A privately owned house is not handed that determination just to look tidy.
Vapor retarder and underslab fill are their own lines when the spec names them. Joints follow a layout sheet. No layout leaves them unresolved. A curing product is an area when the spec names it. Termite treatment under a slab is included only when the spec gives it to this trade.
Forward the foundation sheets and the borings when foundations are in this bid. Nobody stands at the pour.
A pile-supported slab, when the structural notes switch from a shallow footing to piles, is the pile count plus the pile cap yards. Those piles are not added because the county is coastal. A monolithic turn-down edge is still the slab, with the thickened edge measured from the section. Termite bait stations shown only on a pest-control sheet stay off this list unless the concrete spec claims them. A thickened slab edge at a garage is measured from that garage section, not from the house turn-down if the two details differ. Stair pans of concrete are counts. A pool deck, when a pool sheet exists, is not the house slab.
Concrete quantities before treating Jacksonville as a high-velocity zone
Jacksonville concrete questions the code zone does not answer
Does the high-velocity hurricane zone apply in Jacksonville?
No. Those provisions are Miami-Dade and Broward. Duval still follows the wind loads printed on the structural sheets.
Do you add rock or a high water table because Florida has both?
No. Either condition is quantified when this geotechnical report describes it. A missing report leaves it open.
Is $24.25 a yard price?
No. File OEUM002726000000047205103 is the metro hourly figure for Cement Masons and Concrete Finishers.