Wall types · Hold-downs · Hillside only when mapped
San Jose framing counts come from the wall types, and hillside fire rules are not the default for a valley warehouse
Lumber and framing for a San Jose building are piece counts from the structural and architectural wall types. Planning, Building and Code Enforcement is the city reviewer. The statewide cycle that started in 2026 is the code context. It does not replace a missing header schedule. Studs, plates, headers, joists, rafters, and trusses are counted as drawn. Sheathing is sheets by wall and by roof. Engineered lumber is listed by the mark on the plan, not converted into sawn stock.
Hold-downs, straps, and clips are counts from the shear-wall schedule. A schedule that says “see typical” and never draws the typical is an open item. Blocking and backing are counts where the notes locate them. Pressure-treated members are only the pieces the notes mark for concrete contact or weather. They are not every stud because the valley can be damp.
Wildland-urban interface material and a different sheathing spec belong on hillside parcels the map identifies. A north-San Jose industrial shell is not given that sheathing because some other parcel in the city is on a hill. The workbook says which case these drawings are.
Carpenters in San Jose-Sunnyvale-Santa Clara are published at $42.28 an hour on file OEUM004194000000047203103. The occupation title covers a wide range of wood work. It is not a board-foot price. Sunnyvale and Santa Clara are inside the statistic and outside this city’s counter.
Hardware that the steel trade also might buy, such as a knife plate, is flagged so it is not purchased twice. Roof trusses are a count by mark plus the bracing the truss plan shows. A deferred truss drawing that has not arrived is named as missing. Temporary weather protection is a means line only if you ask for means.
Forward the structural sheets, the architectural wall types, and the truss plan if it exists. No wall is field-counted.
A shear wall that changes nailing between floors is two wall types, not one multiplied height. Hold-down posts that are wider than the typical stud are called out as posts. Roof nailers and parapet backing are counts where the roof plan shows them. A deferred shear-wall nailing schedule is named as missing rather than filled with a 6-inch pattern. Window bucks and king studs are counted from the opening width on the plan. A garage portal frame, when the structural sheet uses one, is a piece with its hardware, not a run of studs. Patio covers are rafters and sheathing from that small roof, separate from the house roof.
Framing quantities before treating every San Jose lot as hillside
San Jose framing questions the wall types have to settle
Do you add interface sheathing to every San Jose building?
No. That material is counted when the map and the drawings put the parcel in the wildland-urban interface. A valley shell without that note does not get it.
Is a missing hold-down schedule filled with a typical count?
No. Referenced hardware that is not drawn stays on the open list.
Is $42.28 a board-foot price?
No. File OEUM004194000000047203103 is the metro hourly figure for Carpenters.