Foundation walls · Plaza membranes · Not a beach flood kit
Charlotte waterproofing is the foundation and plaza the details dimension, not a coastal flood assembly
Waterproofing for a Charlotte building is measured from the foundation details, the plaza details, and the specification. The code context is the 2018 North Carolina code still listed as current. Coastal flood construction is an eastern problem. It is not drawn onto a Piedmont basement because the state has an ocean. The area is whatever these details dimension.
Foundation-wall membrane is the area of wall the detail shows, from the top of footing to the termination the detail names. A detail that does not name the termination leaves that edge unresolved. Drainage board and a footing drain are separate lines when both are drawn. Mud slab and a wearing slab are not the membrane between them.
Plaza membrane over occupied space is its own area, including upturns at walls and at penetrations when the detail shows the upturn. Pavers and pedestals above that membrane are a different trade unless this invitation includes them. Planter waterproofing is the planter area, not the whole plaza. A pool, if a pool sheet exists, is not the parking deck.
No waterproofing occupation is cited. Borrowing a roofer or a painter statistic would pretend those crews are this trade. The gap is left open. The January 2023 chart does not list a North Carolina prevailing-wage law for private work.
Elevator pits are the pit wall and slab areas the structural section shows. Tie-back or shoring waterproofing is included only when a shoring drawing shows it. Negative-side coatings on an existing wall are an area only when the spec defines that repair. A full blindside system and a dampproofing bitumen are different products and are not swapped.
Waterstops at joints are linear. Penetration boots are counts. A protection slab is an area when the detail calls for one. Backfill is not waterproofing. Concord and South Carolina details are not measured as this city’s default.
Upload the foundation details, the plaza details, and the specification. No wall is probed.
A below-grade elevator pit in a Piedmont clay site is the pit area the section dimensions. Hydrostatic slabs are an area only when the structural note calls the slab that. A green-roof protection mat is not the membrane under it.
A Charlotte elevator pit in Piedmont soil is the pit surface the section dimensions. A hydrostatic slab is an area only when the structural note uses that word. Green-roof protection mat is not the membrane beneath it. Waterstops at a wall joint are linear. A negative-side coating on an existing basement is only the rooms the repair spec names.
A Charlotte parking deck over a shop space gets the membrane only where the structural plan shows occupied space below. The open top deck is a traffic coating if the spec says so, and that coating is not the same product as the blindside wall. Joint sealant at the deck is linear. Trench drains in the deck are pieces and belong to the deck spec, not to plumbing, unless the plumbing sheet repeats them.
Waterproofing areas before a coastal kit in Charlotte
Charlotte waterproofing questions the map has to settle
Do you add coastal flood waterproofing in Charlotte?
No. Flood and coastal assemblies are an eastern condition. Charlotte quantities follow the details on these sheets.
Why is there no wage?
There is no honest waterproofing occupation to cite. A roofer or painter statistic is not borrowed.
Is the plaza paver the waterproofing?
No. The membrane is its own area. Pavers stay out unless this invitation includes them.