Division pricing · 2018 book · No square-foot factor
A Charlotte cost estimate is a division-by-division reading of these drawings, not a Piedmont square-foot factor
A cost estimate for a Charlotte parcel prices the drawings that were sent. The state code context is the 2018 North Carolina code the fire marshal still lists as current, effective 1 January 2019. The estimate records that context and then prices what the sheets show. It does not apply a cost per square foot of “Charlotte commercial.”
Divisions follow the bid form you send. If you do not send one, the workbook says it used a plain division list. Allowances printed by the owner are carried as written. Design that is still schematic is labeled as a budget, with the gaps named. A complete construction set is not priced as if it were a sketch.
BLS lists Cost Estimators at $38.88 under OEUM001674000000013105103 for Charlotte-Concord-Gastonia, NC-SC. Concord and the South Carolina side of that name are inside the statistic and outside a Charlotte parcel. The figure is not this proposal. Trade labor uses rates you supply. Non-highway private work is not given a state prevailing wage the January 2023 chart does not list.
Civil paving and detention stay out of the building total unless those sheets are invited. Roof assemblies that differ are not averaged into one square before a price is applied. Door leaves and frames stay apart so a later unit price has an honest place to land.
Alternates and unit prices occupy their own pages. A crane or a lane closure is a general-requirement line only when the invitation describes it. Phased pricing, when requested, keeps each phase separate.
A Gastonia or Concord cover sheet is not rewritten as Charlotte. The log names the place. Coastal product approvals are not added to a Piedmont opening schedule.
Hand off the drawings, the bid form, and the invitation. No job walk is attended.
Owner contingencies printed in the invitation are carried as written numbers. A design-assist narrative without quantities is labeled incomplete. Unit prices for rock and for unsuitable soil stay on their own page and are not filled with a Piedmont average.
Cost estimates before a Charlotte square-foot factor
Charlotte pricing questions the square-foot habit creates
Will you price the building as a cost per square foot?
No. The number is built from the quantities in the drawings, division by division. A square-foot shortcut is not the deliverable.
Is the 2024 code the pricing basis?
The state page still lists the 2018 code as current. The estimate uses the edition the drawings name and does not assume the 2024 book is in force.
Is $38.88 the estimating fee?
No. Series OEUM001674000000013105103 is the survey statistic for Cost Estimators. Billing is a separate quote.