F&K Estimatings Construction Estimating & Takeoffs

San Francisco, California · Remote estimating support

Electrical Estimating Services in San Francisco, CA

Send your San Francisco electrical plans to F&K Estimatings and we measure the package your bid needs: conduit and wire by size and length, devices and fixtures counted from the schedules, and feeders and branch circuits built from the one-line diagram and panel schedules. This is estimating under San Francisco's own electrical code and permit process. The fee and delivery date come back in writing after the documents arrive — send the plans, the schedules and the bid date.

Send plans for a scope quote

Project context and local references

Electrical permits in San Francisco come from the Department of Building Inspection, which sorts work into categories: the heavier items — services, subpanels, generators, transformers, fire pumps and UPS equipment — sit in Category 3 and need extra information with the application, and only owners of stand-alone single-family homes may apply to do electrical work themselves. The code in force is the 2025 San Francisco Electrical Code (Ordinance 228-25), operative January 1, 2026, adopting the 2025 California Electrical Code, which is built on the 2023 National Electrical Code. The 2022 edition it replaced rested on the 2020 NEC. Bureau of Labor Statistics wage data puts the area's electricians at $49.85 an hour in May 2025 (OEWS series OEUM004186000000047211103), with cost estimators at $52.66 (series OEUM004186000000013105103) — labour here is priced at the top of the national range. 2025 Census permit figures show 1,444 units authorised in the city at a combined permit valuation of $287.6 million, all but a handful — 1,394 — in buildings of five or more units, so San Francisco electrical work is overwhelmingly multifamily risers, feeders and unit wiring rather than single-family service work. Seismic bracing for conduit racks, cable tray and fixtures is counted as its own scope where the drawings show it.

measure the electrical scope for your San Francisco bid

Hypothetical worked example · not a client project or market quotation

Consider a hypothetical 60-unit apartment building needing a full electrical takeoff. With all but 50 of the city's 1,444 authorised 2025 units in buildings of five or more, the feeder and riser design drives the estimate more than any single dwelling's branch circuits. If the takeoff and pricing effort comes to 50 hours, the estimating labour behind it is worth about $2,633 at the metro cost-estimator mean of $52.66 an hour, before field labour — priced at the electrician mean of $49.85 an hour — so a miscounted riser length compounds quickly. That arithmetic uses public wage and permit data only; it prices no real job.

Review before pricing

Check the package before measuring it. The one-line diagram is read against the panel schedules to catch a feeder that appears on one and not the other, device counts are reconciled between plans and fixture schedules, and the boundary with low-voltage, fire alarm and mechanical-equipment connections is settled so no scope is priced twice or dropped between trades. The NEC edition behind the design is confirmed against the 2025 code now enforced, and temporary power, seismic bracing and owner-furnished equipment each get their own line rather than folding into a lump sum. Anything left open is listed as an allowance with a stated basis or an exclusion.

Documents and requested output

Send the electrical plans with the riser and one-line diagram, the panel schedules and fixture schedule, and the electrical specifications. Add the project address, the bid date and the breakdown you want — CSI Division 26, your cost codes or the bid form. Include the latest addenda, and say whether low-voltage, fire alarm or temporary power belongs in this package or sits with another trade.

What to confirm before comparing bids

Compare bids circuit by circuit, not total by total. One bidder's lower number may mean fixture supply was excluded, or that feeder lengths were taken from an older issue of the drawings. Confirm that every bidder priced the same NEC edition, the same device counts and the same boundary with low-voltage and fire alarm scope. Where a bidder has allowed for seismic bracing and another has not, level the allowance before ranking the totals.

Scope checklist

  • Current electrical plans, including the riser diagram and one-line diagram.
  • Panel schedules and the fixture schedule for the project.
  • Electrical specifications for the package being priced.
  • Most recent addenda, with the drawing issue they amend.
  • Project address, jurisdiction and bid date.
  • Breakdown format: CSI Division 26, cost codes or bid form.
  • Whether low-voltage, fire alarm and temporary power sit in this package.

Source documents for project review

Local references checked . Confirm the current requirements with the project team and relevant authority.

Questions for this estimating scope

What information helps us measure the electrical scope for your San Francisco bid?

Send the electrical plans with the riser and one-line diagram, the panel schedules and fixture schedule, and the electrical specifications. Add the project address, the bid date and the breakdown you want — CSI Division 26, your cost codes or the bid form. Include the latest addenda, and say whether low-voltage, fire alarm or temporary power belongs in this package or sits with another trade.

What needs review before this scope is priced?

Check the package before measuring it. The one-line diagram is read against the panel schedules to catch a feeder that appears on one and not the other, device counts are reconciled between plans and fixture schedules, and the boundary with low-voltage, fire alarm and mechanical-equipment connections is settled so no scope is priced twice or dropped between trades. The NEC edition behind the design is confirmed against the 2025 code now enforced, and temporary power, seismic bracing and owner-furnished equipment each get their own line rather than folding into a lump sum. Anything left open is listed as an allowance with a stated basis or an exclusion.

Discuss your San Francisco project scope

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.