F&K Estimatings Construction Estimating & Takeoffs

Piece counts · Authority from the title block · No imported frost

Las Vegas framing counts follow the plan, and the city edition is copied from the sheets or left blank

Las Vegas lumber quantities are piece counts and board feet from the framing plan. Nevada publishes no single private building code, so the takeoff logs whichever authority the title block names: the City of Las Vegas, Henderson, or unincorporated Clark County. A silent title block leaves the authority blank. This page will not fill in an edition year. A Henderson wall type is not counted on a city set.

Studs, plates, headers, joists, and trusses stay as pieces. Sheathing is sheets. Hangers and straps are counts from the hardware schedule that was issued. A hold-down the schedule does not show is not added because the valley is seismic. Engineered lumber stays as the mark on the plan. A header note with no size is flagged. Truss engineering that has not been issued is an exclusion, not a stick-framed substitute roof.

Series OEUM002982000000047203103 reports $33.51 an hour for Carpenters. Henderson is inside the survey, and so is North Las Vegas. Both are other cities. The figure is an hourly note, never dollars per stud. Nevada prevailing wage on the January 2023 chart starts over $100,000, including redevelopment contracts at that figure. A private house under that line does not receive the public scale. Federal Davis-Bacon is used only when the funding says so.

Pressure-treated plates are a separate piece count only where the spec requires them. Blocking is included when the drawings locate it. A note that says block as required, with no locations, is flagged. Shear-wall nailing is written beside the sheet count when the schedule prints a pattern. Desert heat does not add a stud. The file lists piece counts, hardware counts, the authority note, and anything still open.

Lumber takeoff before guessing a Las Vegas code edition

Las Vegas framing questions

Which building code edition is used?

The edition printed on the drawings. If the drawings are silent, the edition cell stays empty.

Is $33.51 a stud price?

No. OEUM002982000000047203103 is the hourly statistic for Carpenters across Las Vegas-Henderson-North Las Vegas, NV.

Do you add straps the schedule omitted?

No. Hardware is counted from the schedule that was issued.

Las Vegas framing references

Upload the Las Vegas framing plan and the hardware schedule

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.