F&K Estimatings Construction Estimating & Takeoffs

Shear walls · Houston amendments · Piece counts

Houston framing counts follow the shear-wall schedule and the wind notes on that set

Wood framing for a site the City of Houston actually reviews is permitted at the Houston Permitting Center. The city’s published construction-code list, effective 1 January 2024, uses the 2021 International Residential Code and the 2021 International Building Code, each with Houston amendments. Texas statutes point cities at the 2012 books as a floor, and Houston has moved past that floor. A Harris County parcel outside the city limits is not this counter. Wind and hold-down hardware are taken from the structural notes on these sheets. Gulf hurricane exposure is why those notes are often heavy. It is not a license to add straps the schedule does not show. Texas Department of Insurance windstorm rules apply in the designated catastrophe area the statutes describe, which is a coverage and inspection question, not a extra stud in every wall.

Studs, plates, headers, joists, and trusses are piece counts and board feet. Sheathing is sheets. Hangers and straps are counts from the hardware schedule. Pressure-treated sills at concrete are a separate piece count where the spec or the code note requires them in this humid climate. They are not sprayed onto every plate. Engineered lumber is listed by the mark on the plan, not converted into dimensional lumber “for pricing.” Shear-wall nailing is a schedule note that changes the sheathing labor even when the sheet count stays the same, so the nailing pattern is written beside the sheet total. Blocking for accessories is included when the drawings locate it. A “block as required” note without locations is flagged. Truss engineering that has not been issued yet is an exclusion, not a stick-framed substitute roof. Header sizes are taken from the plan marks. A “header as required” note without a size is flagged. Shear-wall hold-downs are counts from the schedule, and the nailing pattern is written beside the sheathing total so labor is not hidden. Engineered lumber stays as the mark on the plan rather than being rewritten as dimensional stock.

Carpenters in Houston-Pasadena-The Woodlands average $25.48 an hour on May 2025 series OEUM002642000000047203103. That occupation description includes a wide range of wood work. It is not a board-foot price and not a prevailing-wage rate. Texas public work can carry prevailing wage with no dollar minimum on the January 2023 federal chart. A private house does not. There is no statewide general-contractor license to cite in place of the city’s registration rules.

The list is produced from the plans. No wall is field-measured and no city registration is filed for you. Send framing plans, the shear schedule, and the truss layout if you have it.

Lumber takeoff rules before Houston’s amendments

Houston framing items that should stay on their own lines

Does the 2012 Texas baseline mean Houston still reviews the 2012 IRC?

No. The 2012 books are the statutory floor. Houston’s published list effective 1 January 2024 uses the 2021 IRC and IBC with city amendments.

Should every wall get hurricane straps because the city is on the Gulf?

No. Straps and hold-downs are counted from the schedule. Wind exposure explains why the schedule is often long. It does not fill in missing hardware.

Is the carpenter average a framing price?

No. Series OEUM002642000000047203103 is a metro wage. Production and the hardware schedule still have to be applied by the bidder.

Houston framing sources

Upload Houston framing plans and the shear schedule

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.