Conflict list · Not a permit review · Houston set
A Houston drawing review flags quantity conflicts and leaves city inspections to the city
This review is a preconstruction reading of the drawings for a bidder. It is not the Houston Permitting Center’s plan review, and it does not produce a city comment letter. What it produces is a list of sheet conflicts that change quantities or trade responsibility: an architectural wall type that disagrees with structure, a mechanical schedule that names an efficiency the energy form does not, a plumbing spec written to a code book the city’s 1 January 2024 list does not use. The city’s list is the context for catching that last error. The reviewer does not stamp the set.
City inspection labor and estimating labor are different jobs in the wage survey. Construction and Building Inspectors in Houston-Pasadena-The Woodlands average $34.92 an hour on May 2025 series OEUM002642000000047401103. Cost Estimators average $40.78 on series OEUM002642000000013105103. Citing the inspector figure as if it were our fee, or the estimator figure as if it were a city salary, would mix two occupations. Neither is the proposal amount.
Typical conflicts that change a Houston number include a plumbing spec that cites the IPC while the city list uses the uniform code, a roof fastening note that never defines corner zones, and an energy form whose insulation R-value does not match the wall section. Each is written with both sheet numbers. Life-safety ratings that the partition schedule does not pick up are listed as missing assemblies, not designed for you. Deferred submittals, such as stairs or curtain wall, are named so the estimate can exclude them until the submittal exists. Comments you already received from the city are compared with the drawings so a resolved comment is not priced as open. Grid shifts between architectural and structural column lines are called out because they move every bay quantity. A civil sheet at a different scale from the architectural site plan is noted so paving is not double-counted.
The review does not estimate a fee for the permit itself and does not predict how many review cycles the city will take. Those are owner costs unless your bid form assigns a number. Structural calculations stamped by the engineer are not rechecked for correctness. They are read only for the member sizes the takeoff would later use.
You still decide what to do with each conflict. We do not call the plans examiner and we do not redesign the detail. Send the issue you intend to price and any review comments you already have, so superseded notes are not treated as current.
Plan-review support described apart from any one city counter
What this Houston drawing review will not do
Will this satisfy the Permitting Center’s review?
No. It is a bidder’s conflict list. The city’s review is a separate process with its own comments.
Why mention inspector wages at all?
So they are not confused with estimator wages. The two May 2025 series are different occupations. Neither is a fee for this review.
Do you propose design fixes?
No. Conflicts are described with the sheet numbers. The design team decides the fix.