Unpriced · 8th Edition · 2020 electrical book
A Jacksonville takeoff has to say that electrical is the 2020 code while the building volume is the 8th Edition
A Jacksonville quantity takeoff is an unpriced measurement of the sheets you send. The Building Inspection Division is the enforcing agency. Its code list puts building, residential, plumbing, mechanical, fuel gas, and energy on the Florida Building Code, 8th Edition (2023), and puts electrical on NFPA 70, the 2020 National Electrical Code. The cover note of the workbook records that split so an electrical sheet written to a later book can be flagged. The note does not change a conduit length. Duval County is outside the high-velocity hurricane zone. Opening and roof ratings still follow the schedules that were attached.
Counts, lengths, areas, and volumes keep a sheet number. Dollars stay off. Concrete yards, framing pieces, and roof areas stay in separate groups. Door leaves and frames are not merged. A schedule that never arrived is listed as missing rather than copied from a previous Duval job.
Civil paving and drainage are absent unless those sheets are in the package. A high water table is not turned into extra excavation without the geotechnical report. Product-approval numbers are copied from the specification when the spec prints them. They are not invented to fill a blank mark.
Cost Estimators in the Jacksonville wage area are published at $36.63 an hour on file OEUM002726000000013105103. Measurement-only work is not its own occupation. The figure is not the fee for the workbook. The fee is quoted from the size of the PDF.
A clouded revision is checked against the prior issue only when you include that prior issue. The first page names the file that was measured. Fire-lane paint stays on the civil sheet. No street address of the division is written into the workbook.
Forward the plan set and say whether the electrical sheets use the 2020 book or name a different year. Nobody visits the site to complete a missing schedule.
A roof plan that shows two assemblies, a low-slope membrane and a steep-slope shingle, keeps two areas even on an unpriced sheet. Skylight curbs are counts. Equipment screens are steel until a note assigns them to the roofer. The product-approval column is filled only from the specification. A blank mark stays blank rather than inheriting the approval number of the mark above it. Balcony rail posts are counts when the architectural elevations dimension them. They are not assumed from a typical bay. Soffit panels of metal are an area. A louver schedule that belongs to mechanical is named and left out of the opening count. Repeat unit plans in a subdivision are measured once and extended by the count of that plan. A clubhouse is not one of the houses. Site lighting poles are not building quantities. They wait for a site electrical sheet. Repeat balcony rails on a mid-rise are counted from the elevation that shows them, then extended by the floors that elevation actually repeats. A ground-floor storefront is not that balcony. Elevator fronts are frames from the elevator shop drawings when those drawings are attached, and they are named as absent when they are not.
Measured quantities before merging Jacksonville’s electrical year with the building book
Jacksonville measurement questions the edition split creates
Will the takeoff assume the 8th Edition covers electrical too?
No. The division’s list keeps the 2020 National Electrical Code on its own line. The cover note repeats that split.
Are prices included?
No. The deliverable is quantities, sheet references, and gaps.
Is $36.63 the fee?
No. File OEUM002726000000013105103 is the metro hourly figure for Cost Estimators. The fee is a separate quote.