Room schedule · Casework apart from paint · No lump allowance
Columbus casework, trim, and specialty finishes are counts from the room schedule, not a single finish allowance
Interior and exterior finishes for a Columbus building are taken off the room finish schedule, the interior elevations, and the specialty drawings. Inspections & Code reviews the building under the state minimum codes. The 1 January 2026 cycle change is context for which book the notes cite. It does not merge casework, trim, tile, and paint into one allowance per square foot of floor.
Plastic-laminate casework is counts of base and wall cabinets from the elevations, plus the linear feet of countertop. Solid-surface and stone tops are separate materials when the spec splits them. Millwork panels and standing trim are their own lines. A reception desk drawn only as a rectangle, with no section, is named as undesigned rather than given a guessed cabinet count.
No finish-trade wage for Columbus, Georgia is in the extract used here. Nothing is borrowed from another city to fill the blank. Georgia has no state prevailing-wage statute on the January 2023 chart. A school solicitation can still carry a federal determination. A private office does not.
Toilet accessories and partitions are counts from their schedules. Lockers are counts by opening. Wall protection and corner guards are lengths when a finish sheet shows them. Exterior soffit panels and a storefront surround are areas or lengths from the elevations, and they are not interior trim. Signage is omitted unless a sign drawing is attached.
Owner-furnished furniture shown for space planning is excluded and listed. Built-in seating that the millwork spec claims is a count. Window stools are lengths. Closet shelving is a count of shelves or a length of rod as the elevation dimensions it. A typical unit in a repeated plan is measured once and extended by the number of that plan, not by a guess of how many units “usually” match.
Phenix City rooms are not Columbus rooms. If the set mixes both, the workbook says so and measures only the Georgia sheets you identify.
Upload the finish schedule, the interior elevations, and the specialty drawings. No room is walked.
Choir rails and a chancel platform are counts from the interior elevations. Banquette seating built by the millworker is linear. A ticket window is one specialty frame. Cultured-marble tops in a dorm bath are counts of tops, not wall tile.
Finish quantities before a single Columbus allowance
Columbus finish questions the schedule has to split
Will you use one finish allowance per square foot?
No. Casework, trim, accessories, and specialties stay in separate lines taken from the drawings. A missing elevation is a gap, not an allowance.
Is owner furniture included?
Only when the millwork or specialty spec says the contractor buys it. Space-planning furniture is excluded and listed.
Why no wage?
The May 2025 extract used here has no Columbus, Georgia row to cite for this scope. Another metro is not substituted.