Wall sections · Air barrier · Inland, not Savannah
Columbus insulation and air-barrier quantities come from the wall sections, not from a coastal humidity rule
Insulation, air barriers, and roof underlayment for a Columbus building are areas from the sections. Inspections & Code enforces the state minimum codes, which moved onto the 2024 I-Code cycle on 1 January 2026. An application started earlier can remain on the previous cycle. The workbook records the edition the drawings name. It does not upgrade a wall because the calendar has turned.
Cavity insulation and continuous insulation are separate areas when the section draws both. A section that shows only one layer is not given the other because summers are humid. Roof insulation is the thickness and the area the roof plan shows. A tapered scheme is measured only where the roof plan draws the crickets and the thicknesses. A silent plan leaves taper unresolved.
Weather barrier and flashing are areas and lengths from the details. A self-adhered membrane at openings is linear around those openings when the detail shows it. It is not a second full-wall area. Vapor-retarder location follows the section. An inland Columbus wall is not detailed as a coastal Savannah wall unless these sheets say so.
No insulation occupation for the Columbus, Georgia area is in the May 2025 wage extract used here, so no hourly statistic is printed. Do not borrow an Atlanta or a Savannah figure. The January 2023 chart does not list a Georgia prevailing-wage law. Federal money can still name a determination in that solicitation.
Firestopping at rated penetrations is a count of penetrations when a firestop spec is in the set, and it is kept apart from the batt area. Spray foam, if specified, is the area and the thickness the spec prints, not a conversion of every batt into foam. Below-grade dampproofing is the foundation area the detail shows, and it is not the above-grade air barrier.
A Phenix City sheet mixed into the PDF is flagged. Alabama’s code is not this office’s book. Roof edge metal that the roofing trade buys is noted so this package does not purchase it again.
Upload the wall sections, the roof plan, and the energy forms if they were issued. No wall is opened.
Parapet coping underlayment is linear and is not the field membrane. A canopy roof gets its own area. Through-wall flashing at a shelf is linear at each floor the section repeats. A garage-lid membrane over occupied space is not attic insulation.
Envelope quantities before treating Columbus as a coastal wall
Columbus envelope questions the section has to settle
Did every Columbus wall move to a 2024 insulation thickness on 1 January 2026?
No. The state minimum cycle changed for new applications. Thickness still comes from the sections and the energy forms in this set. An older filing can remain on the prior cycle.
Why is there no wage on this page?
The May 2025 extract used here does not contain a Columbus, Georgia insulation occupation. Another metro’s figure is not substituted.
Is below-grade dampproofing the same area as the wall air barrier?
No. Each follows its own detail. They are not one square footage copied twice.