For a commercial bid in Taylor, Texas, define the tenant boundary before combining architectural and MEP quantities. A retail or office fit-out can include partitions and finishes while leaving incoming services, roof equipment or shell repairs in another contract. Send the landlord work letter alongside the current drawings so the estimate follows the actual division of work.
Send plans for a scope quoteSeparate tenant fit-out quantities from landlord work
Hypothetical worked example · not a client project or market quotation
Consider a hypothetical 2,400-square-foot tenant suite. The finish plan identifies 1,650 square feet of resilient flooring and 450 square feet of tile; the remaining 300 square feet is a back-of-house area with retained concrete. The new finish total is 2,100 square feet, not the entire suite area. A 7% ordering allowance applied only to resilient flooring produces 1,765.5 square feet of that material. Keep the 115.5-square-foot allowance separate from the measured installed area; tile waste requires its own layout basis.
Review before pricing
Reconcile room tags with the finish schedule and check whether demolition, slab preparation, wall base and transitions belong in the same subcontract. Do not apply the flooring allowance to installation labor automatically. If a finish changes by addendum, replace only the affected room quantities and record the new drawing issue.
Documents and requested output
Provide the suite address and ZIP code, lease boundary, landlord responsibility matrix, finish and ceiling plans, MEP schedules, specifications and bid deadline. Request room-by-room quantities, separate removal and new-work columns, a landlord/tenant exclusions register, and agreed pricing inputs if you need costs.
What to confirm before comparing bids
Ask each bidder to identify the same finish codes and drawing revision. Compare preparation, transitions and waste treatment before comparing totals. A separate allowance for an unresolved floor condition should remain visible until the contractor confirms its basis. F&K provides remote drawing-based estimating; the project documents establish the scope and jurisdiction.
Questions for this estimating scope
What information helps us separate tenant fit-out quantities from landlord work?
Provide the suite address and ZIP code, lease boundary, landlord responsibility matrix, finish and ceiling plans, MEP schedules, specifications and bid deadline. Request room-by-room quantities, separate removal and new-work columns, a landlord/tenant exclusions register, and agreed pricing inputs if you need costs.
What needs review before this scope is priced?
Reconcile room tags with the finish schedule and check whether demolition, slab preparation, wall base and transitions belong in the same subcontract. Do not apply the flooring allowance to installation labor automatically. If a finish changes by addendum, replace only the affected room quantities and record the new drawing issue.