2014 building code · 2012 IBC base · Not the house book
An Indianapolis commercial estimate stays on the 2014 state building code, which is still a 2012 IBC base
A commercial estimate for an Indianapolis parcel prices the drawings under the commercial book, not the house book. Indiana’s 2014 Building Code, effective 1 December 2014, is based on the 2012 IBC and is what the Fire Prevention and Building Safety Commission put in force for commercial work. A 2021 detail is not assumed to be what plan review is enforcing. The estimate says which edition the drawings name. A house on the same bid list is the residential code, a different model year, and a different page.
This page does not invent a city department title. The state commission’s books are the edition fact. The local official who reviews a parcel inside Indianapolis is whoever the permit set names. Carmel and Greenwood share the wage-survey name and are other cities. Their covers are not rewritten as Indianapolis.
File OEUM002690000000013105103 records Cost Estimators at $37.99 an hour for Indianapolis-Carmel-Greenwood. The occupation estimates. It is not the bid and not a craft rate. Indiana repealed the Common Construction Wage in 2015. The January 2023 chart lists no state prevailing-wage law and notes that wages on contracts awarded before 1 July 2015 can still be enforceable. A new private bid does not receive a state scale. Davis-Bacon is a funding question printed in that solicitation. The fee is a separate quote.
Shell and tenant work in one PDF are split before they are priced. If the set never draws the landlord line, the gap is listed. Process equipment and racking are measured only from the sheets that show them. Alternates stay on their own pages.
Divisions follow your bid form. Self-perform crews are separated only where you say which crews are yours. A crane or a street closure is a general-requirement line only when the invitation describes it. Freeze-thaw protection for winter flatwork is a means note when you say the placement is in freezing weather. It is not extra cubic yards.
Karst and voids are a south-central Indiana geotech issue when the report says so. They are not drawn under every Indianapolis slab. The borings control.
Pass the invitation and the commercial set, and say whether a house is mixed into the same PDF. No pre-bid meeting is attended.
A logistics building with a separate racking package keeps the racks out of the shell. Dock levelers are counts. A freezer box inside a warehouse is its own insulated enclosure. Mezzanine framing is not the ground-floor slab.
Commercial estimates before using the house code on an Indianapolis warehouse
Indianapolis commercial questions the two code cycles create
Is a warehouse on the same code year as a house?
No. Commercial work is the 2014 Indiana Building Code on a 2012 IBC base. One- and two-family work is the 2020 residential code on a 2018 IRC base.
Did the common wage come back?
Not on the January 2023 DOL chart, which records the 2015 repeal. A new private bid is not given a state scale. Read the funding documents for Davis-Bacon.
Is $37.99 the fee?
No. Series OEUM002690000000013105103 is the survey hourly statistic for Cost Estimators.