F&K Estimatings Construction Estimating & Takeoffs

Independent city (not St. Louis County) · St. Louis · City of St. Louis Building Division

St. Louis City permits stop at the city line, and the masonry is on the drawings

The City of St. Louis is an independent city. It is not inside St. Louis County, and the City of St. Louis Building Division does not review a Clayton or a Chesterfield address. That split causes more bad assumptions than the code year does. Missouri has no statewide private-building code, so the city’s adopted International edition and amendments are the rules for a parcel inside the city. Write that jurisdiction on the estimate before you write a unit price.

The building stock that shows up in bid sets is brick and masonry, a lot of it existing, plus downtown and midtown renovation and a scatter of new industrial work near the river and the highways. Existing-building scope has to stay visible: demolition, repair, and new work are different quantities. New Madrid seismic influence is a southeastern Missouri and city structural issue when the structural notes invoke the seismic system. It is not a reason to add anchors to a partition that the drawings show as non-structural. Karst is more of a southern-Missouri soils story than a default city footing.

Moderate frost and a four-season climate affect footing depth and winter concrete the same way they do in the rest of the state: follow the detail, and ask before you add temporary heat. Prevailing wage on Missouri public work exempts projects of $75,000 or less on the January 2023 federal chart. Above that, the rate is a county or city determination, not a single metro number. A private rehab does not collect that rate.

F&K will not pull a Building Division permit or meet the inspector. Send the architectural and structural sets, the demolition sheets, and any geotech. If the site is actually in the county, say so in the first email so the assumption log does not name the wrong reviewer.

Masonry takeoffs on these renovations should separate face brick, backup, restoration, and new openings. Tuckpointing that is specified by the square foot is not the same quantity as full veneer replacement. Where the drawings say “match existing” without a product, list the product as an allowance the owner must confirm. Do not invent a brick manufacturer or a project you did on a particular block. A Cortex or downtown lab fit-out is still just the sheets in the zip file: casework, shaft ratings, and equipment anchors counted separately from the base building the landlord already bought.

Blueprint estimating starts with the plan set, not with the address. Architectural, structural, mechanical, electrical, plumbing, and civil sheets are read together with the schedules, the legends, and the specifications, and the quantities that come out — counts, lengths, and areas by trade — are returned as a schedule with a sheet reference beside every line. Sheets are reconciled against each other: a wall shown as removed on the demolition plan and rebuilt on the new-work plan is counted once, in the right scope, and a schedule that disagrees with its own plan is flagged with both sheet numbers rather than averaged. A revision cloud is measured as a delta only when the prior issue is in the upload; without it, the cloud is a gap, not a quantity.

The reviewing authority follows the parcel, and the takeoff names it on the first page of the assumption log. Inside the independent city, construction drawings are reviewed for code compliance by the Building Division's Plan Exam Section, staffed by licensed design professionals; a parcel in a St. Louis County municipality goes to that municipality's own reviewer instead, under its own adopted code. That split is why the plan set's jurisdiction line matters before any quantity is trusted — a detail approved under one reviewer's code year does not automatically hold under another's. F&K's plan reading is a bidder's quantity exercise on the same drawings, not the city's review: no drawings are stamped, no permit is filed, and no call is made to the plan examiner.

The deliverable is a quantity schedule and a marked-up set, so the reviewer can see which sheet produced each line. Addenda are priced as deltas against the issue they revise, and a sheet that never arrived — a missing structural set, a schedule page left out of the upload — is logged as a named gap rather than filled from a similar job. The quote confirms the scope and the delivery date in writing before measuring starts. What the number does not contain is written on the same page as the number itself.

St. Louis sample sheets

St. Louis bid questions

Does the St. Louis County code apply inside the City of St. Louis?

No. The city and the county are separate governments. The City of St. Louis Building Division reviews parcels in the independent city. County municipalities have their own adoptions.

Should seismic anchors be added to every St. Louis wall?

Only where the structural drawings call for them. New Madrid influence explains why some sets are specific. It does not fill in anchorage the sheets omit.

Are you located in St. Louis?

No. The estimate is prepared remotely from the documents. This page is not an office and not a list of completed local jobs.

What is blueprint estimating for a St. Louis project?

Quantities measured from your plan set — counts, lengths, and areas by trade, tied to sheet numbers — delivered as a schedule your team prices. It is a bidder's takeoff from the drawings, not a permit review and not a site measurement.

Do you review plans the way the Building Division does?

No. The city's Plan Exam Section reviews construction drawings for compliance with the building code. F&K reads the same set for quantities: what is drawn, how much of it, and where the sheets disagree. Different job, same drawings.

St. Louis drawing upload

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.