Planting plan · Irrigation · LADBS site
Los Angeles Landscaping Estimating Services
Get landscaping takeoff services for Los Angeles construction and improvement bids. F&K Estimatings organizes plant counts, surface areas, soil volumes, irrigation and hardscape into a drawing-referenced schedule. Provide the exact project address and current review set so the bid uses the intended documents.
Landscape sheets for a City of Los Angeles parcel sit beside the building review at the Department of Building and Safety, but the plants and the pipes are not a building-area plug. The 2025 Title 24 cycle, effective 1 January 2026, governs the building. Irrigation and planting follow the landscape drawings, the water-efficiency notes those drawings already carry, and any planning condition printed on the set. A regional preference for low-water plants is not a reason to delete turf the plan still shows, or to add drip the plan does not. Count what is drawn.
Trees and shrubs are counts by size from the plant schedule. Groundcover, mulch, and import soil are areas and volumes. Header board and steel edging are lengths. Irrigation mainline, laterals, heads, valves, and the controller are a second takeoff so they are not smeared into the planting dollar. Backflow hardware is a count from the detail. Hillside lots mapped into a wildland-urban interface can limit planting near the structure. Apply that limit only when the plans or a condition of approval say the parcel is in the zone. A flat lot in the basin is not given a brush-clearance quantity without a documented requirement.
Courtyards over a podium garage need a soil depth and a drainage mat the detail either shows or fails to show. If the depth is missing, the cubic yards are an open item. Street trees required by a planning note are counted only when the note and the spacing are in the package. They are not assumed from the length of the frontage. Decomposed-granite paths, concrete mow bands, and site furnishings are hardscape. They stay out of the planting extension unless the request says the landscape contractor holds the flatwork. A temporary irrigation run for establishment, if the note gives a duration and a layout, is listed separately from the permanent heads so it is not left in the ground-count forever.
Landscaping and Groundskeeping Workers across Los Angeles-Long Beach-Anaheim average $22.19 an hour in the May 2025 release, series OEUM003108000000037301103. That occupation mixes grounds maintenance with installation labor. It is a poor stand-in for a licensed landscape crew’s burdened rate, and it is not used here as one. Public landscape contracts still take the wage determination in the specifications. Private work does not grow one because the state has a prevailing-wage law.
Soil amendments are a volume only when the agronomic note or the detail gives a depth and a product. “Amend as required” with no depth is an open item. Mulch depth is the same kind of number: two inches and three inches are not the same cubic yards, and a detail that omits the depth does not get a nursery default. Import topsoil and on-site screened soil are different lines when the grading plan distinguishes them. Export of palm or tree stumps, if the demolition of existing planting is in this package, is a count of tags on the removal plan, not a guess from an aerial photo.
Nobody walks the slope or flags the valves. Send the planting plan, the irrigation plan, the details, and any planning condition that changes plant palette or clear space.
Landscape measurement scope before local planting rules
Keep courtyard access assumptions visible in the estimate
For a podium courtyard, compare planting details with architectural and structural sections before pricing. List growing media, drainage layers, edge details and any lifting or staging allowance separately. Identify the trade responsible for waterproofing protection before including it in the landscape bid.
Los Angeles landscape items that get invented too often
Do you convert every lawn to a drought planting because the project is in Los Angeles?
No. The plant schedule is the quantity. A water-efficiency note changes the takeoff only where it changes the drawn plants or the irrigation type.
Is brush clearance added on every hillside job?
Only when the plans or the approval conditions put the parcel in a wildland-urban interface and describe the clear zone. Otherwise it is excluded.
Does the groundskeeping wage price the installation?
No. OEWS series OEUM003108000000037301103 is a broad occupation average. It is not a landscape bid.