Quantities only · LADBS set · Title 24
A Los Angeles takeoff measures the checked set and leaves the prices off
This deliverable is a list of quantities with sheet references. Prices are a different engagement. For work inside the City of Los Angeles, say whether the Department of Building and Safety is the reviewer and whether the set was drawn to the 2025 Building Standards Code, effective 1 January 2026, or to an earlier cycle that is still the permit of record. School work can move to the Division of the State Architect, and hospital work to HCAI, even when the street address is in the city. The cover sheet names that path. Measuring a DSA set as if LADBS were the only reviewer mixes two comment styles.
Concrete, rebar, framing, envelope, and the trades you name are extended in the units you specify. Seismic anchorage, hold-downs, and drag hardware are counts from the structural sheets, not a factor on floor area. If a detail is referenced and not drawn, it is listed as missing. Title 24 energy forms are read for insulation and glazing values when you include the envelope. They are not converted into a dollar of energy compliance. Rebar is extended by bar size and length from the schedule, with lap lengths only when the general note gives the lap. A note that says “typical lap” without a number is flagged. Formwork contact area is not the same as concrete volume. Both can be on the sheet if you ask for both.
Cost Estimators in Los Angeles-Long Beach-Anaheim average $43.64 an hour under May 2025 series OEUM003108000000013105103. People who only measure are not split out of that occupation in the OEWS file. The average does not set the fee. The fee follows the sheet count and the trades in the quote. Public jobs over the state’s prevailing-wage threshold still need the determination identified if you later ask for labor pricing. This takeoff does not apply that determination.
Area separations between covered parking and the dwelling above are measured on their own wall types. A podium slab is both a structural deck and, sometimes, a waterproofed surface. The takeoff does not merge those into one square foot. Civil quantities for driveways and retaining walls stay out unless the invitation includes the civil set. When it does, cut and fill come from the grading table the civil engineer printed, not from a visual read of the contours. Door and window counts, if that trade is included, come from the schedules rather than from an elevation sketch.
Send the disciplines to measure, the unit list, and the issue date. There is no site walk, no LADBS portal login, and no correction response drafted for the architect.
How a quantity takeoff is delivered in any state
What a Los Angeles takeoff will not invent
Are labor rates included?
No. The sheet is quantities and gaps. Labor pricing is a separate scope and needs your rates or a wage determination.
Does every Los Angeles school set stay with LADBS?
No. K-12 and community-college work can be a Division of the State Architect review. Read the cover sheet before assuming the city is the authority.
Will seismic hardware be a percentage of structural steel?
No. Anchors, braces, and hold-downs are counted from the details that show them. Missing details are exclusions.