Plaza over parking · Planters · Below-grade only if drawn
Phoenix membrane areas are the plaza over the parking and the planter walls, not a basement that was never drawn
The waterproofing that shows up on Phoenix drawings is usually a plaza or a planter over occupied space, not a deep basement. Planning & Development’s 2024 building book, in force since 1 August 2025, does not assign the square footage. The detail does. Membrane, protection, and drainage mat are separate areas when the detail shows each. A podium driving surface and a planter wall are not one horizontal number.
Below-grade dampproofing is included only to the height the foundation detail dimensions. The basin’s usual dryness does not delete a membrane that was drawn, and it does not add one that was not. Elevator pits, where a pit is actually in the structural set, are a small area of their own. Joint sealant at the curtain wall above a plaza is easy to leave in both the glazing package and the membrane package. The log names one trade. Waterstops are lengths from the structural joints.
No May 2025 occupation in this metro file isolates membrane applicators, so no roofer or painter wage is borrowed. If you need labor, use your applicator’s rate. The quantity is still the area on the sheet.
Send plaza and foundation details and the membrane specification. No flood test is witnessed. Pool decks and their deck drains are a separate area from a parking plaza and are included only when the pool sheets are part of this invitation.
Protection board and drainage composite are areas only when the detail shows them. They are not automatic companions of every membrane. Planter walls are vertical area, separate from the horizontal plaza. The below-grade limit is the dimension on the foundation section. A note that says waterproof to grade, without a height, is a gap. Waterstops at pour joints are lengths from the structural details. Negative-side or injection work is excluded unless a repair drawing shows it. Hose bibbs draining across a plaza are plumbing until the detail assigns them to the membrane contractor. The log names one trade for the sill joint so it is not sold twice.
Cants and sealant at a rising wall are lengths. A drainage composite that turns up the wall is vertical area to the height shown, not the full planter height by assumption. Root barriers in a planter, if specified, are an area separate from the membrane. Paver pedestals over a plaza membrane are counts or an area of pedestals as the layout shows, and they are not membrane. Overflow scuppers through a parapet above a plaza are counts and may belong to the roofer. The log assigns them once. Protection during backfill is a means note, not a second membrane area.
Membrane areas before Valley plaza details
Phoenix membranes that are not basements
Do you omit waterproofing because Phoenix is dry?
No. Drawn membranes are measured. Undrawn ones are exclusions. Climate does not edit the detail.
Is the plaza part of the roof square?
Not unless one specification and one contractor own both. The plaza area stays separate.
Which wage applies to applicators?
None is cited from the wage file. Use your crew rate rather than a neighboring trade.