Atlanta, Georgia · Remote estimating support
MEP Estimating Services in Atlanta, GA
Send your Atlanta MEP drawings and get one coordinated estimate covering mechanical, electrical and plumbing — measured together, so shared equipment, sleeves and final connections are priced once and by the right trade. F&K builds separate schedules for HVAC, electrical and plumbing quantities, then rolls them into a single package total your bid team can trust. Once the documents are reviewed, you receive a written quote covering the scope, the fee and the delivery date.
Send plans for a scope quoteProject context and local references
Atlanta’s building permits, inspections and code enforcement sit with the Office of Buildings inside the Department of City Planning. The code set that office now enforces has been effective for permit submissions since January 1, 2026: the 2024 mechanical, fuel-gas and plumbing codes, the 2024 building and residential codes and the 2024 swimming-pool code — each with Georgia Amendments — together with the 2023 National Electrical Code, also amended for Georgia. Applications filed before February 1, 2026 were still judged under the codes in force when they arrived; the 2018 editions are now history for new work. Energy rules still follow the 2015 IECC with Georgia supplements and amendments dated 2020, 2022 and 2023, which shapes HVAC equipment and insulation quantities. Labor across the three trades is tightly bunched in the Atlanta metro: May 2025 BLS means put electricians at $29.82, plumbers and pipefitters at $28.85 and HVAC mechanics and installers at $29.07 an hour (series OEUM001206000000047211103, OEUM001206000000047215203 and OEUM001206000000049902103). The work behind those rates is overwhelmingly apartment-led: of the 5,622 units permitted in the City of Atlanta during 2025 — at a combined permit valuation of $947.5 million — only 561 were detached single-family houses, while 4,669 — 83% — were apartments in buildings holding five or more homes, so coordinated multi-trade packages, not single-trade house work, dominate the local pipeline.
coordinate your Atlanta MEP package
Hypothetical worked example · not a client project or market quotation
Hypothetical worked example: a 60-unit apartment building needing 600 electrician-hours, 500 plumber-hours and 450 HVAC-hours across the three trades. At the Atlanta metro means, the direct labor comes to $17,892 for electrical, $14,425 for plumbing and $13,081.50 for HVAC — $45,398.50 combined, before materials, equipment and markup. A single-trade quote would show only one of those three lines, and the gaps between them — who sets the packaged unit, who wires it, who connects the condensate — are exactly where a combined package earns its keep: every interface is assigned to a trade before the total is struck.
Review before pricing
Before pricing, line up the three discipline sets against each other: the mechanical schedule, the electrical panel schedule and the plumbing fixture schedule should agree on every shared piece of equipment, and any mismatch should be flagged rather than priced twice. Confirm who supplies, sets and connects each packaged unit, who carries the controls wiring, and where the plumbing scope ends and the site utilities begin. Check the drawing issue date on each set — a mechanical set one revision behind the electrical set is a common cause of a short MEP total. Finally, confirm the code sheet cites the current Georgia editions, so the estimate is priced to the codes the permit will be judged under.
Documents and requested output
Send the full coordinated MEP drawing set with the mechanical, electrical and plumbing schedules, the MEP specifications, and fire-protection drawings where they form part of the package. Add the project address and Atlanta jurisdiction, the current addenda and the bid deadline. Tell us how the numbers should be broken down — separate schedules per trade, a single package total, or both. Say whether the project is publicly or privately funded, and name any wage determination in the bid package.
What to confirm before comparing bids
When comparing MEP bids, check that each bidder priced the same interfaces: equipment supply, setting, final connections, controls and testing should sit with the same trade in every price, or the totals cannot be compared. Look for the shared items — sleeves, housekeeping pads, condensate drains — and confirm they appear exactly once. Ask whether the price covers the current addenda, and confirm the delivery date against your bid deadline.
Scope checklist
- Full MEP drawing set with mechanical, electrical and plumbing schedules
- MEP specifications with the code sheet for the project
- Fire-protection drawings, where included in the package
- Project address and Atlanta jurisdiction
- Current addenda and the drawing issue for each discipline
- Required breakdown — separate trade schedules, package total, or both
- Public or private funding, and any wage determination in the package
Source documents for project review
Local references checked . Confirm the current requirements with the project team and relevant authority.
- City of Atlanta Office of Buildings — permits, inspections and code enforcement
- Georgia DCA — Current State Minimum Codes (2024 editions, 2023 NEC, 2015 IECC)
- BLS OEWS May 2025 — Electricians, Atlanta–Sandy Springs–Roswell, $29.82/hr (OEUM001206000000047211103)
- BLS OEWS May 2025 — Plumbers, Pipefitters, and Steamfitters, Atlanta–Sandy Springs–Roswell, $28.85/hr (OEUM001206000000047215203)
- BLS OEWS May 2025 — HVAC Mechanics and Installers, Atlanta–Sandy Springs–Roswell, $29.07/hr (OEUM001206000000049902103)
- U.S. Census Bureau, Building Permits Survey 2025 — place-level file, South Region (Atlanta: 5,622 units)
Questions for this estimating scope
What information helps us coordinate your Atlanta MEP package?
Send the full coordinated MEP drawing set with the mechanical, electrical and plumbing schedules, the MEP specifications, and fire-protection drawings where they form part of the package. Add the project address and Atlanta jurisdiction, the current addenda and the bid deadline. Tell us how the numbers should be broken down — separate schedules per trade, a single package total, or both. Say whether the project is publicly or privately funded, and name any wage determination in the bid package.
What needs review before this scope is priced?
Before pricing, line up the three discipline sets against each other: the mechanical schedule, the electrical panel schedule and the plumbing fixture schedule should agree on every shared piece of equipment, and any mismatch should be flagged rather than priced twice. Confirm who supplies, sets and connects each packaged unit, who carries the controls wiring, and where the plumbing scope ends and the site utilities begin. Check the drawing issue date on each set — a mechanical set one revision behind the electrical set is a common cause of a short MEP total. Finally, confirm the code sheet cites the current Georgia editions, so the estimate is priced to the codes the permit will be judged under.