F&K Estimatings Construction Estimating & Takeoffs

Counts and lengths · Issued set · Five boroughs

A New York City takeoff is a measured sheet, not a priced bid

This service measures. It does not, by itself, price. For a parcel the Department of Buildings will review, the measured set should be the issue that matches the 2022 Construction Codes when that is the code on the title block, effective 7 November 2022. If the permit was filed under an earlier city code, measure the edition the drawings were drawn to and say so. Do not “update” quantities to a newer amendment the designer did not use. The state code used upstate is the wrong reference inside the boroughs.

Output is a spreadsheet of counts, lengths, areas, and volumes with the sheet number beside each line, plus a marked PDF. Waste is a separate column when you ask for it. Conflicts between architectural and structural sheets are listed, not averaged. A missing riser, a blank door schedule, or a foundation detail that says “see geotech” becomes an exclusion. Local labor is not applied. If you later want costs, that is a different scope and a different quote.

The nearest published occupation for the person who organizes these counts is still Cost Estimators, even though this deliverable stops before the price. May 2025 series OEUM003562000000013105103 shows that occupation at $44.54 mean hourly in the New York-Newark-Jersey City metro. Takeoff technicians are not their own OEWS line. The figure is not the fee for the spreadsheet. Fees are quoted from the sheet count and the trades you include.

Ask for the unit system in the same email as the files. Cubic yards of concrete, tons of rebar, square feet of partition, and counts of fixtures should not be converted after the fact into a contractor’s private cost codes unless those codes were attached. Color markups on the PDF are there so a reviewer can see what was included. A clouded revision is measured as a delta against the prior issue when you send both issues. One PDF named “final” with no date is not a revision history.

Shafts, bulkheads, and cellar areas are part of the gross figure only when you want gross area. Trade quantities ignore gross area and follow the assembly. A cellar with a low slab and a sump is concrete, waterproofing, and plumbing, not a single square-foot plug. Tell us which of those assemblies you want. Unlisted assemblies stay off the sheet. Duplicate sheet numbers from an architect and a consultant are not added together; the log should say which discipline owns the number.

Upload the disciplines you want measured and say the units. A concrete-only request should not be returned as a full building. F&K does not visit the block, does not confirm a sidewalk vault, and does not file the permit. The files are the job.

Quantity takeoff deliverables that apply in any city

NYC takeoff boundaries that should be agreed up front

Does the takeoff include labor rates or material prices?

Not unless a separate priced scope is quoted. The default deliverable is quantities, sheet references, and a list of gaps.

Which code edition should the quantities follow?

The edition named on the set being measured. A 2022 city-code project and an earlier vested filing are not remeasured to match each other.

Can you take off only Division 3?

Yes. Name the divisions or trades. Unnamed work is excluded rather than sketched in.

Sources for the NYC measurement note

Send the NYC sheets you want counted

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.