One-line · Energy-form controls · SDCI

Seattle electrical quantities follow the one-line, and lighting controls follow the energy forms rather than a guessed count

Seattle electrical quantities are gear counts, feeder lengths, device counts, and control counts. SDCI reviews the city. The 2021 state code has applied since 15 March 2024, and Seattle’s energy amendments show up in the lighting forms issued with the set. Those forms do not replace the fixture count. Fixtures still come from the lighting plan. Controls come from the control diagrams. A missing diagram leaves the controls blank.

Switchgear and panelboards are each. Feeders are lengths by raceway size where the riser gives both size and path. Devices are each off the power plan. Raceway is extended only when both size and path are printed. If the panel schedule and the one-line disagree, both are printed and neither is averaged. Bracing of equipment and of conduit is a count of the braces the details draw. It is not a percentage of gear cost.

Electricians are recorded at $47.94 on OEUM004266000000047211103 for Seattle-Tacoma-Bellevue. Bellevue is in the number and is not this counter. The figure is not a feeder price. A private tenant build-out does not inherit a public determination. A state campus job is read on its own solicitation.

Photovoltaic modules, inverters, and battery cabinets are counts when those sheets exist. They are not added because an energy note mentions solar-ready. Vehicle-charging spaces are counts from the garage or site plan. Fire alarm and telecom stay out of a power-only bid. A generator yard is equipment plus the feeder the site plan dimensions. House meters are one per dwelling when the plan shows them separate.

A Tacoma or Bellevue one-line is not extended under Seattle energy forms. The deliverable is the counts, the lengths, the energy-form note, and the blanks. The general electrical method is on the national page.

Shore-power receptacles, when a Seattle waterfront sheet shows them, are each plus the feeder that serves them. A traction elevator disconnect is one each. Ballasted roof arrays are module counts, and the ballast is not raceway. Heat-trace circuits on leaders are lengths only where the electrical plan draws the circuit.

A Seattle dwelling-unit panel inside a multi-family building is one panel per unit the matrix names, and the feeder to that panel is a length only when the riser dimensions it. House panels in the garage are separate from the dwelling panels. Site lighting on a waterfront pier, when that sheet exists, is pole and head counts from the site plan, not the interior lighting plan. A traction elevator disconnect is one each. Shore-power receptacles are each plus the feeder the one-line shows. Ballasted roof modules are module counts, and the ballast is not raceway. Heat-trace circuits on roof leaders are lengths only where the electrical plan draws the circuit. A Bellevue one-line is excluded from the Seattle extension.

Electrical quantities before inventing Seattle lighting controls

Seattle electrical bid questions

Do the energy forms replace the fixture count?

No. Fixtures come from the lighting plan. Controls come from the diagrams. A missing diagram stays blank.

Do you add solar because of an energy note?

Modules and inverters are counted from the sheets that show them. A solar-ready note is not a module count.

Is $47.94 a price per foot of conduit?

No. OEUM004266000000047211103 is the hourly statistic for Electricians.

Seattle electrical references

Upload the Seattle one-line and energy forms

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.