F&K Estimatings Construction Estimating & Takeoffs

Separate Valley cities · One log per bid · Remote

Phoenix-area bids are not one code just because the wage survey uses one metro name

The wage survey area is Phoenix-Mesa-Chandler. The building official is not. A bid inside Phoenix has used Ordinance G-7397 since 1 August 2025: 2024 model codes, two plumbing volumes, and the 2023 electrical code, enforced by Planning & Development. A bid in a neighboring city can be a year behind or a year ahead. The support arrangement keeps a code line on each invitation so Monday’s Phoenix shell does not donate its code block to Tuesday’s Mesa tenant job.

Cost Estimators in that combined wage area are published at $40.52 hourly mean, May 2025 file OEUM003806000000013105103. That occupation is the estimator, not the block mason and not the electrician. Trade columns use the rates you supply. Arizona shows no state prevailing-wage law on the January 2023 chart. A federally assisted school still uses the decision in that solicitation, and the private shop next door does not.

Allowances stay at the amount printed. Alternates stay off the base. A civil addendum about a retention basin does not rewrite an interior package that never included site work. The fee for the support is quoted against the list of bids, not against the estimator wage. Files only. No Valley plan room.

Unit-price rows on a city bid form are filled only for the rows you assign. Blank rows stay blank rather than receiving a number from a previous Valley job. Allowances printed as lump sums stay lump sums. They are not opened into invented counts of doors or squares of roof. Two bids that share a subcontractor quote are checked against that quote’s exclusions before the quote is used twice. A shell package and a later tenant package at the same address remain two scopes. Future equipment noted on the shell is not moved onto the tenant set unless the tenant drawings show it.

General requirements use the duration printed on that invitation. They are not a percent of trade cost copied from a different city. Insurance and bond lines appear only when the front-end section asks for them. A missing structural PDF blocks the foundation number on that bid alone. Testing and inspections stay with the owner unless the form moves them into the contract. Elevators and kitchen equipment need their own sheets. A by-owner note is an exclusion. The support quote lists the bids and the fee before work starts.

Multi-bid support without this metro’s city boundaries

Valley bid-list mistakes the metro name encourages

Does the Phoenix-Mesa-Chandler wage area mean one building code?

No. The wage area is a statistical boundary. Each city adopts and amends its own book. Phoenix’s August 2025 ordinance stops at the Phoenix city limit.

Will every trade column use $40.52?

No. That hourly mean is only the cost-estimator occupation. Trade labor comes from your rates or from a determination the bid actually attaches.

Is the estimator based in Phoenix?

No. Each set is read remotely. There is no local seat and no city counter visit.

References for Valley multi-bid support

Send the Valley bid list

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.