Alternatives with a code path · Tenth Edition · Not a silent delete
Boston value engineering lists an alternative only when the drawings or the code path can actually use it
Value engineering for a Boston set is a written list of alternatives, prepared remotely, each tied to the sheet it would change. The statewide code is 780 CMR Tenth Edition, effective 11 October 2024. An alternative that only works under a stretch energy code is labeled that way, and it is not offered as if this page had confirmed Boston’s adoption. If the set has no stretch form, the alternative says it needs that form before it is real.
Each idea carries what it removes, what it adds, and what it does not know. A cheaper assembly that misses a rated wall or a flood criterion printed on these sheets is not listed as a save. Coastal flood and wind items stay when the notes put the parcel in that condition. They are not stripped because a downtown project “usually” is outside the floodplain.
File OEUM001446000000013105103 records Cost Estimators at $52.11 for Boston-Cambridge-Newton, MA-NH. The occupation estimates. It is not a guarantee of savings and not the fee. Labor on a covered public job uses the Department of Labor Standards schedule for that project. There is no dollar minimum on the January 2023 chart. A private alternative does not inherit a public wage just because the base bid was public.
Structural alternatives are described, not redesigned. This service does not stamp drawings. A snow-load change or a footing-depth change is flagged for the engineer of record. Quantity differences are measured only for the option whose sketches you accept as the basis. A verbal idea with no sketch is named as unmeasured.
Cambridge or Newton code amendments are not assumed to match Boston. Product or-equals stay or-equals. Life-safety ratings are not traded away. Temporary works and means are outside the list unless you ask for them.
The deliverable is the list, the quantity delta, and the open questions. It is not a revised bid. You choose what to send back to the designer.
Upload the pricing set and the target you care about. No design meeting is attended.
Swapping a rainscreen for a cheaper cladding is listed only with the thermal and attachment changes the wall section would lose. Deleting a rated shaft is not offered. A shorter pile is an engineer question, not a save this list prices.
Scope alternatives before stripping a Boston life-safety item
Boston value-engineering questions the code path creates
Will you delete scope to hit a number?
No. Each alternative says what it removes and what code path it needs. A rated assembly or a flood note on these sheets is not stripped to make a total.
Do you redesign the structure?
No. Structural ideas are described for the engineer of record. Nothing here is stamped.
Is $52.11 a savings rate?
No. Series OEUM001446000000013105103 is the survey hourly statistic for Cost Estimators. It is not a promise of savings.