Unpriced · Tenth Edition · Energy form as attached
A Boston takeoff records 780 CMR and then measures only the sheets that arrived, including whichever energy form they use
A Boston quantity takeoff is an unpriced measurement. The code context on the cover note is 780 CMR Tenth Edition, effective 11 October 2024. A stretch or specialized energy form is recorded only when it is in the set. This page does not assert that Boston adopted one. Cambridge, Newton, and any New Hampshire sheet are different authorities and are flagged rather than measured as Boston.
Each line keeps the sheet it was scaled from. Prices stay off the lines. Concrete, framing, and roof surfaces stay in separate groups. Bar steel is summed by size from the schedule that was attached. A missing schedule is named as missing. Door leaves and frames stay in different columns.
Snow load and footing depth are taken from the structural notes and the footing details. They are not looked up from a ZIP code, and a New Hampshire ground-snow value is not imported. Flood elevations are copied only when a flood note is on these sheets.
Cost Estimators are listed at $52.11 on OEUM001446000000013105103 for Boston-Cambridge-Newton, MA-NH. Measurement-only work is not its own occupation. The statistic is not the price of the workbook. The quote follows the size of the PDF. A public wage schedule is not pasted onto an unpriced sheet. The January 2023 chart shows no dollar minimum for covered public work. That is a labor question for a priced estimate, not a quantity.
A clouded revision is checked against an earlier issue only if you attach that earlier issue. Repeat floors are measured once and extended by the count of that floor. A floor with a different setback is not the typical floor. What you receive is the quantities, the sheet references, the code note, and the gaps.
Measured quantities before assuming a Boston stretch-code adoption
Boston takeoff bid questions
Will the takeoff assume the stretch energy code?
No. Base 780 CMR is the statewide context. A stretch form is recorded only when it is in the set.
Are prices included?
No. The workbook is quantities, sheet references, and gaps. A priced estimate is a separate request.
Is $52.11 the measurement fee?
No. OEUM001446000000013105103 is the hourly statistic for Cost Estimators.