F&K Estimatings Construction Estimating & Takeoffs

780 CMR Tenth Edition · Stretch not assumed · Remote

A Boston construction estimate names 780 CMR Tenth Edition, and it does not assume the stretch energy code

A construction estimate for a Boston parcel prices the drawings, remotely. The Massachusetts State Building Code, 780 CMR, Tenth Edition, effective 11 October 2024, is based on the 2021 I-Codes and is enforced statewide. Many cities have also adopted a stretch energy code or a specialized opt-in code. This page does not claim Boston has adopted either. The energy basis is whatever the permit set’s forms say. Two towns can share 780 CMR and still differ on the envelope. Cambridge and Newton are other cities in the wage survey. A New Hampshire sheet is another state.

This page does not invent a Boston department title. The local official is whoever the permit set names. Divisions follow the bid form you send. Allowances are carried as written. A square-foot factor for “Boston commercial” is not the deliverable.

File OEUM001446000000013105103 places Cost Estimators at $52.11 an hour for Boston-Cambridge-Newton, MA-NH. The occupation estimates. It is not the fee and not a craft rate. The January 2023 chart lists Massachusetts prevailing wage with no contract-size minimum. Schedules are issued for the project by the Department of Labor Standards. That is not a single Boston rate. A private job does not pick up a public schedule. Billing is a separate quote.

Zone 5 brings snow and freeze-thaw. Ground snow is the value on the structural notes, not a New Hampshire number pasted across the line. Coastal flood and hurricane criteria apply when the flood map and the structural notes put this parcel there. They are not added to every downtown interior. Moderate frost is the footing depth the detail draws.

Alternates sit on their own pages. A crane or a street occupancy is a general-requirement line only when the invitation describes it. A shell and a tenant package are identified before they are priced. A missing landlord line is a gap.

The construction supervisor license is a state residential credential. It is not a substitute for the trade licenses on a commercial job, and it is not a quantity.

Hand off the drawings and the bid form, and say whether an energy stretch form is in the set. No pre-bid meeting is attended.

A party-wall agreement is not a quantity. Underpinning of a neighbor is included only when a structural sheet shows needles or pins. A roof deck over a brownstone is its own area and is not the top-floor apartment.

A brownstone roof deck is its own framing and membrane, not the top-floor apartment. Underpinning pins are counts only when a structural sheet shows them. Party-wall pockets are not assumed on a freestanding building. A sub-basement vault is a room of its own. Window wells are counts. The stretch energy form is used only if it is actually in the PDF.

Construction estimates before assuming Boston adopted the stretch energy code

Boston estimate questions 780 CMR leaves to the city

Does the stretch energy code apply to every Boston bid?

Not from this page. Base 780 CMR is statewide. Stretch and specialized opt-in codes are municipal. The forms in this set say which one was used. This page does not assert Boston’s choice.

Is there a dollar threshold before prevailing wage applies?

The January 2023 chart shows none. Covered public works use the project schedule from the Department of Labor Standards. That schedule is not one citywide rate.

Is $52.11 the fee?

No. Series OEUM001446000000013105103 is the survey hourly statistic for Cost Estimators.

Boston estimating references

Hand off the Boston drawings and say if a stretch form is included

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.