After award · Revised sheets · Original log
Philadelphia change orders are priced against the original assumption log, not against a new guess
This support starts after a Philadelphia contract exists. Revised sketches, bulletins, and field questions are compared with the set that was priced. The difference is quantified. Licenses and Inspections comments that change a detail are priced only when the response drawing shows the change. A comment that has not been drawn is not given a quantity. The code context remains the book that governed the original permit, including the city’s amendments to the 2021-based state code where that was the filing.
Schedules of values can be organized to the owner’s form. Budget tracking uses the cost reports you send. It does not invent job-cost history. Party-wall or sidewalk changes are included only inside the revised limit of work.
Construction Managers in the Philadelphia-Camden-Wilmington wage area are published at $64.96 hourly mean, 2025 file OEUM003798000000011902103. That occupation is not this service and not a superintendent on the site. The figure is a labor-market reference for a different job. The fee for document support is quoted separately. No one is stationed in the city.
Send the original set, the original assumption list, and the revised pages. The delta is what gets priced.
Pay-application quantities are checked against the schedule of values you send, not rebuilt from scratch each month. Stored materials are listed only when your report identifies them. A bulletin that adds a window and deletes a door shows both the add and the credit. Overhead and profit follow the contract percentages you provide. They are not inserted from a city habit. Time extensions are recorded as calendar notes if the bulletin states them. They are not turned into general-conditions dollars unless you ask for that pricing and give the daily rate.
Stored-material billings are accepted only from the report you attach. A sketch that moves a kitchen stack shows the added pipe and the pipe deleted. General-conditions days are priced only if you supply the daily rate. Calendar slips stated in a bulletin are recorded as dates, not converted into dollars on their own. Party-wall protection added by a revision is an area from that revised sheet. The original log remains the baseline so a second bulletin does not reprice work already in the contract.
Change-order support before any one city’s comments
Philadelphia changes that need a drawing before they get a number
Can an inspector’s verbal comment be priced?
Only after it is on a revised sheet or a written bulletin. Undrawn comments stay off the change order.
Is the construction-manager wage your fee?
No. File OEUM003798000000011902103 describes construction managers. This support is remote document work with its own quote.
Do you rebuild the whole estimate for every bulletin?
No. The bulletin is priced as a difference from the original scope, additions and deletions both shown.