Owner front end · Public wage · Campus drawings
Chicago schools and hospitals are estimated from that owner’s front end, not from a downtown office template
Institutional sets in Chicago arrive with an owner’s front end that a private loft conversion does not have: prevailing-wage instructions, product standards, phasing around occupied buildings, and sometimes a different reviewing authority than a storefront alteration. The Department of Buildings is still the city building official for a private institutional building in the city. A state-funded campus can add its own review. The cover sheet and the invitation say which comments will actually land. Code Memorandum 2026-001’s calendar still applies to the city permit: applications started on or after 1 December 2026 take the 2026 titles; earlier starts may not. A campus standard specification does not repeal that calendar.
Phasing is a quantity problem. Temporary partitions, after-hours shifts, and infection-control barriers are included when the phasing sheets draw them. They are not a percent of construction cost because the building is a hospital. Classroom counts, nurse-call scope, and kitchen equipment stay in the divisions that draw them. General requirements are built from the duration in the invitation, not from a citywide month count. Occupied renovations need a demolition quantity that respects rooms remaining in use. Those rooms are not in the gut area. Temporary egress and temporary fire alarms, when the phasing plan draws them, are counts. A summer-slip schedule for a school is a calendar fact from the invitation. It does not by itself add temporary classrooms. Lab casework and fume hoods are included only with their drawings. A note that equipment is owner-furnished is an exclusion.
Cost Estimators in this metro average $43.76 an hour on May 2025 series OEUM001698000000013105103, and that still does not price the nurses’ station or the wage determination. If the solicitation is public, the classification sheet in that solicitation is the labor basis. If it is a private university, do not paste a public schedule on because the building looks institutional. Send the front end with the drawings. The work is remote. There is no desk on the campus. Commissioning hours and owner training are carried only when the front end states them. Temporary classrooms are not added just because the work falls in a school summer. Lab casework and fume hoods need their own drawings. Owner-furnished equipment is an exclusion with the sheet cited. Abatement remains a licensed price even on a summer shutdown. Phasing drawings that show only a hatched wing are measured for that wing. The rest of the campus is not given a renovation allowance. Temporary fire-alarm devices drawn on the phasing plan are counts. Owner training hours stay out unless the front end lists them.
Institutional estimating scope before this city’s permit calendar
Chicago institutional assumptions that do not travel
Does every school bid in the city carry Illinois prevailing wage?
Only when the solicitation says the work is covered. A private campus project is not public work merely because it has classrooms.
Are infection-control barriers a standard percent?
No. They are measured from the phasing or infection-control sheets. An undrawn barrier is an exclusion.
Will you attend the pre-bid walk at the hospital?
No. Notes from a walk you attended can be sent with the drawings. The measurement itself is from the documents.