One project · Design stage · Priced divisions
One Chicago project gets one priced estimate, with the design stage written on the cover
This page is a single priced estimate, not a standing bid desk. The building whose drawings you send is checked against the Chicago volume that applies to its permit path. If the architect has already elected the 2026 amendments in Memorandum 2026-001, the estimate says so. If the set is a 2019-cycle Title 14B building with the prior mechanical text, the estimate says that instead. Mixing the two inside one number is how allowances hide scope. Energy forms are read. They are not replaced with a state checklist from a downstate city.
A schematic set is priced as a budget. Incomplete assemblies are allowances with the design stage named, and the allowance is not disguised as a measured quantity. A construction-document set is measured and then priced with the cost sources you agree: your historical costs, supplier quotes you provide, or a public wage schedule if the job is covered. The May 2025 average for Cost Estimators, $43.76 an hour under series OEUM001698000000013105103, describes the people who build estimates in this metro. It is not the fee for this proposal and not a trade rate. The fee is quoted from the documents before work starts.
Divisions stay in your cost-code order when you send one. Exclusions are listed in sentences a reviewer can argue with. Sales tax on materials is not given a flat Illinois percent on this page, because the contract form changes the treatment. Ask for tax as an allowance you will confirm if you need the line at all. Self-perform work and subcontract work can be split if you say which divisions you build with your own crews. The split is not guessed. Equipment rentals that the estimate carries are the pieces the construction schedule implies only when you gave a duration. Otherwise equipment is limited to what the specifications require the contractor to provide, such as a listed hoist. Contingency is a line you set. It is not inserted as a hidden percent. Self-perform and subcontract divisions are split only where you say which crews are yours. Equipment is limited to what the specifications require unless you gave a duration that supports a named hoist or crane. The workbook shows the quantity under every price.
One project, one issue, one price. No second project is inferred from the same upload. No site meeting is held in the city.
Cost estimating scope that is not tied to Chicago’s amendment window
How a single Chicago estimate stays honest about gaps
Will schematic drawings be treated as if they were construction documents?
No. The cover of the estimate names the design stage. Missing assemblies are allowances, not fake quantities.
Does $43.76 an hour buy the estimate?
No. That is the May 2025 OEWS mean for cost estimators in the metro. The proposal states a fee for the documents in front of us.
Can the same upload produce a second building’s number?
Only if you send that building’s drawings as their own issue. One PDF is one scope.