A Fort Worth construction estimate names the city’s code list, including a 2015 energy path and a 2026 electrical book
A construction estimate for Fort Worth is a priced reading of the drawings, prepared remotely. Development Services is the building official inside the city. The published list is the 2021 building, residential, mechanical, plumbing, fuel-gas, fire, and existing-building codes, the 2015 energy code, the 2018 pool and spa code, and the 2026 National Electrical Code effective September 1, 2026, each with the local amendments the page describes. Energy compliance may instead follow ASHRAE 90.1-2013, but only as a complete path. Dallas’s dates are not written onto this log.
Divisions follow the bid form you send. Self-perform work and subcontract work are split only where you say which crews are yours. Alternates stay on separate pages. A crane, a hoist, or a lane closure is a general-requirement line only when the invitation describes it. Contingency is a figure you set.
A shell and a later tenant package in one PDF are identified before they are priced. If the set never draws the line between them, that missing line is an exclusion. Civil detention and off-site utilities stay out of the building total unless the invitation includes those sheets.
Cost Estimators are recorded at $41.89 on series OEUM001910000000013105103. The series is Dallas-Fort Worth-Arlington, so it is not a Fort Worth-only estimator wage and it is not this proposal. Trade labor comes from rates you supply. The fee to build the estimate is quoted from the documents before the number is assembled.
A school or other public invitation is read for a wage determination. A private invitation on the same afternoon is not given that determination for consistency. The assumption log keeps them apart.
Forward the invitation and the drawings. No pre-bid conference is attended.
Unit prices requested by the invitation stay on a separate page from the lump-sum divisions. A rock allowance is not invented to fill a boring log that never arrived. Sales-tax treatment of materials is left for the contractor’s accountant. This estimate does not pick lump-sum versus separated for you. The bid form you send is the structure of the number. A tenant improvement stacked on a shell in the same PDF is priced only in the portion the invitation names. Allowances printed by the owner are carried as written. They are not replaced with a market guess. Phased pricing, when the invitation asks for phases, keeps each phase on its own page. A design-build narrative with no drawings is not given quantities. The log says the set is incomplete. Owner-furnished equipment shown for space planning is excluded and listed so it is not purchased in the trade columns. A pool drawn on the architectural site plan is measured from the pool sheets under the 2018 pool and spa code the city lists. A site plan that only says “future pool” does not get a shell volume. COMcheck output is a compliance attachment, not a quantity of insulation.
Construction estimates before pasting Dallas dates onto Fort Worth
Fort Worth estimate questions the city list has to settle
Will you use Dallas code dates on a Fort Worth bid?
No. The log uses Fort Worth’s published list: 2021 building books, a 2015 energy path or ASHRAE 90.1-2013, and the 2026 NEC effective September 1, 2026.
Is the pool code part of every bid?
The city has adopted the 2018 pool and spa code. A pool is quantified only when the drawings include one.
Is $41.89 the fee?
No. Series OEUM001910000000013105103 is the metro figure for Cost Estimators. The fee is a separate quote.