A San Jose takeoff records which counter reviews the parcel, then measures only the sheets that arrived
A San Jose quantity takeoff is an unpriced measurement. Planning, Building and Code Enforcement is the reviewer for a parcel inside the city. The statewide building standards in force since the start of 2026 are named on the cover note so an electrical or energy sheet written to an older cycle can be flagged. That note does not scale a conduit run or an insulation area. Sunnyvale and Santa Clara are different authorities. A sheet from one of those cities, stapled into the same PDF, is called out rather than measured as if this department had adopted it.
Every line keeps the sheet it was scaled from. Prices are absent. Slab yards, stud counts, and roof surfaces stay in their own groups. Bar steel is summed by size from the schedule in the set. If that schedule is absent, the line says absent. Leaves and frames occupy separate columns.
Seismic hardware is a count from the structural schedule. It is not a factor applied to floor area. Hillside interface materials are included only when the drawings put the parcel there. A north-valley industrial shell is not given hillside sheathing by default.
File OEUM004194000000013105103 lists Cost Estimators at $52.40 an hour for San Jose-Sunnyvale-Santa Clara. A measurement desk is not a separate occupation in that file. The statistic is not what this workbook costs. The quote depends on how large the PDF is.
A bubbled delta is checked against an earlier issue only if you include that earlier issue. Page one names the file used. Off-site pipes and ponds stay out unless their PDFs came along. Painted fire lanes remain a civil item.
Forward the plan set and name the city on the cover. Nobody visits the site to invent a missing schedule.
Equipment pads on a roof are areas from the structural plan and are easy to leave inside the roofing square if nobody lists them. Penetration counts for pipes and ducts are taken from the coordination drawings when those drawings exist. A missing coordination set leaves penetrations as a gap. Furniture and owner equipment that are shown for reference are not measured. A lab bench that is owner-furnished is excluded even when the architect drew it for coordination. Wall protection and corner guards are lengths only if a finish sheet gives them to a trade you included. Signage is omitted unless a sign drawing is attached. A below-grade garage ramp is its own slab thickness from the ramp section, including thickened edges at the walls. It is not the office floor plate above. Waterproofing on that ramp is a different trade. Shoring along a property line is a length only when a shoring drawing is attached.
Measured quantities before treating Sunnyvale as San Jose
San Jose measurement questions the cover sheet settles
Will you measure a Sunnyvale sheet as a San Jose sheet?
No. The cover note names the authority. A neighboring city in the same wage area is flagged, not blended.
Does the takeoff include prices?
No. The workbook is quantities, sheet references, and gaps. Pricing is a later step if you ask for it.
Is $52.40 the measurement fee?
No. File OEUM004194000000013105103 is the published hourly statistic for Cost Estimators. The measurement is quoted on its own.