F&K Estimatings Construction Estimating & Takeoffs

Unpriced sheet · Dallas city limits · No wage column

Dallas quantities are measured from the issued set, and the metro wage is not written into the sheet

The workbook lists counts, lengths, areas, and volumes with a sheet number on each line. Dollars stay off. If the parcel is inside Dallas, the cover note names Development Services, the 2021 books effective 12 May 2023, and the 2023 NEC effective 23 May 2025 for electrical scope. That note is why an electrical spec still written to an older code is flagged. It does not scale a conduit run. A Fort Worth or suburban sheet stapled into the same PDF is called out as a different authority.

Name the units in the transmittal. Pier concrete is taken from the pier schedule rather than from a clay multiplier. Each roof system keeps its own area so a price added later is not forced onto a combined figure. Reinforcing is totaled by bar size. A schedule that never arrived is listed as missing. Detention yards are omitted unless the civil PDF is part of what you sent.

Cost Estimators are the nearest occupation in the file, $41.89 hourly mean for Dallas-Fort Worth-Arlington, 2025 file OEUM001910000000013105103. Measurement-only work is not its own line. What you pay for the workbook depends on how large the PDF is, not on that wage.

No site dimension is taken. Upload the disciplines and name the current PDF.

Grade-beam yards and the void-form area under them can both be listed because they answer different questions. Tilt-panel concrete is separate from the floor slab. Embeds in those panels are counts. Roof systems stay grouped even on an unpriced sheet. Leaves and frames stay in different columns. A clouded delta is measured against the previous issue only if you attach that previous issue. The workbook’s first page records the file name that was used. Fire-lane paint and wheel stops stay with the civil sheet and are not folded into the building quantities.

Void-form area under grade beams is listed beside the beam yards. Select fill under a slab is a volume from the soils recommendation when the recommendation gives a depth. Without a depth the fill is named and the thickness stays open. Tilt-panel area is face area from the elevations, separate from the floor. Anchor bolts in those panels are counts. The workbook cover records the PDF name that was measured.

Unpriced quantities before Dallas code dates

Dallas quantities that stay off the price columns

Will the sheet include labor rates?

No. You receive quantities and gaps. Rates are a later quote.

Do you apply a pier factor for Dallas clay?

No. Pier yards come from the structural schedule. Without a schedule and a soils report, piers are a gap.

Why is a Fort Worth wage file mentioned on a Dallas page?

Because BLS publishes one figure for the Dallas-Fort Worth-Arlington area. It is not a Dallas city rate and not a fee.

Dallas quantity references

Send the Dallas sheets to measure

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.