Chapter 10 · 30 January 2025 adoption · 2021 energy code kept
San Antonio quantities have to name which book the sheet belongs to, because the energy code did not move with the building code
A San Antonio quantity takeoff is an unpriced measurement of the sheets you send. The Development Services Department is the city’s building official. On 30 January 2025 the council adopted 2024 editions of the building, existing-building, fire, fuel-gas, mechanical, plumbing, residential, and swimming-pool codes, and it adopted a National Electrical Code in that same action. The city page does not print the NEC edition year, so this workbook does not invent one. The International Energy Conservation Code was left out of that cycle and remains the 2021 edition. Insulation, envelope, and lighting-power quantities are tagged to the energy sheets. They are not assumed to have moved to 2024 just because the architectural cover did.
New Braunfels shares the wage-survey name and does not share this ordinance. A parcel outside San Antonio is not measured as if Chapter 10 applied. A project on a federal installation is not given the city book merely because the installation sits in the metro. The cover sheet and the invitation decide the reviewer. The measurement itself stays in the units the drawings use.
Bexar County is not on the Texas Department of Insurance designated catastrophe area. A coastal windstorm certificate is not a Bexar line. Edge metal, openings, and clips are still counted when the sheets draw them. The missing certificate does not delete those counts and does not add a coastal form the sheets never showed.
Cost Estimators across San Antonio-New Braunfels are published at $38.85 an hour on 2025 file OEUM004170000000013105103. Measurement-only work is not its own occupation. The published figure is the estimator, not a price for the workbook and not a New Braunfels rate pasted onto a San Antonio parcel. What you pay for the measurement is a separate quote that follows the size of the PDF.
Concrete yards, masonry units, and roof areas stay in separate groups so a price added later has a place to land. Reinforcing is totaled by bar size from the schedule that was attached. A schedule that never arrived is listed as missing rather than copied from another job. Door leaves and door frames stay in different columns. Roof assemblies are not merged into one area when the plan shows more than one system.
A clouded revision is compared with the previous issue only when you attach that previous issue. The first page of the workbook records the file name that was measured. Civil detention is absent unless the civil PDF is part of what you sent. Fire-lane striping and wheel stops stay on the civil sheet.
Forward the plan set and say whether the energy sheets are included. Nobody visits the site to invent a missing schedule.
Chapter 35 on the same city page is the unified development code. Zoning text and a setback note are not quantities. A sidewalk, a driveway apron, or a buffer planting becomes a measurement only when a civil sheet draws it. Sign area under the sign code is left out unless the invitation includes the sign drawings. Property-maintenance citations are not a scope of work.
Measured quantities before mixing San Antonio’s two code dates
San Antonio measurement questions the two code dates create
Did the energy code move to 2024 with the building code?
No. The city says the energy code was excluded from the 30 January 2025 adoption and remains the 2021 edition. Envelope quantities follow the energy sheets you attach.
Which NEC year should the takeoff name?
The codes page lists a National Electrical Code in that adoption and does not print the edition year. The workbook names the year only when the drawings name it.
Is $38.85 the fee for the takeoff?
No. File OEUM004170000000013105103 is the metro hourly figure for cost estimators. The measurement fee is quoted separately.