Counts and lengths · Sheet numbers · One jurisdiction
Houston quantities are counts and lengths, with the permit jurisdiction written once
The product is a spreadsheet and a marked PDF. Dollars stay off unless a later quote adds them. For a City of Houston parcel, the code context is the Permitting Center list that took effect 1 January 2024. That context tells us which missing notes are worth flagging, such as a plumbing specification written to the wrong model code. It does not change a measured length. County work and suburban work get their own one-line jurisdiction note so a Houston label on the title block is not trusted blindly.
Ask for the units up front. Cubic yards, tons, squares, and fixture counts are not converted into your cost codes after the fact unless you attached the codes. Concrete volume and formwork area can both be delivered. Roofing squares are not combined across systems. MEP pipe and duct are not one “systems” lump. Missing schedules are listed. Cost Estimators average $40.78 an hour in the metro on May 2025 series OEUM002642000000013105103, and people who only measure are not broken out of that occupation. The average does not set the fee. Sheet count and trades do.
Rebar schedules are extended by mark, with stock lengths left as a bidder choice unless you ask for a cut list. Slab depressions and trenches are volumes of their own so they are not lost in a uniform slab thickness. Roof squares are reported by system even on a quantity-only sheet, because a later price cannot be applied to a blended square. Door leaves and frames are separate counts when both are on the schedule. Hardware sets are counted from the set numbers, not assumed as one set per leaf. Civil pipe, if included, is length by size and depth class from the profile, not from the plan view alone. Finish areas are net of openings only when you ask for net area. Otherwise the gross wall area and the opening deduction are both shown so you can choose. Roof systems are not blended into one square on a quantity sheet. Hardware sets are counted from set numbers. Civil pipe depths come from profiles when the civil set is included. A clouded revision is a delta only when the prior issue is attached.
A revision cloud is measured as a delta when you send the prior issue. Replacing the whole workbook without a delta hides what changed. Duplicate sheet numbers from two consultants are logged, not added. Gross floor area is optional and is never the basis of the trade quantities.
No site dimension is taken and no permit tech is contacted. Send the disciplines and the issue date.
A quantity-only sheet can become a priced estimate without being measured twice. The priced scope keeps the same quantities and the same sheet references, then adds material, labor, and equipment prices from the sources you agree — your crew rates, your supplier quotes, or the wage determination in the invitation on public work. Nothing is re-measured: the takeoff workbook becomes the backup under the priced summary, and any alternate is carried as its own priced line rather than folded into the base. Pricing is a separate scope with its own written quote; it is never added silently to a takeoff order.
Ask for pricing when you send the set, or after the takeoff is delivered — either way, say which labor basis the prices should use and whether the invitation names a wage determination. The priced estimate is described on the Houston construction-estimating page, listed in the sources below. To talk through the scope first, call (317) 751-5969 with the project address, the drawing issue, and the bid deadline.
Quantity takeoff output described without Houston’s code list
Houston takeoff rules that keep prices out
Will the spreadsheet include unit prices?
Not in this scope. You get quantities, references, and gaps. Pricing is quoted separately.
Do you merge a suburban set that was stapled to a Houston set?
No. Different authorities are measured as different jobs or the extra set is excluded. Say which PDF is the bid.
Does the estimator wage change the fee?
No. It is a labor-market figure. The fee follows the sheets and the trades you name.
Can this takeoff become a priced estimate later?
Yes. The same quantities are priced as a separate scope, from the labor basis and supplier sources you agree, with a written quote confirming it first. The priced deliverable is described on the Houston construction-estimating page, linked in the sources below.