F&K Estimatings Construction Estimating & Takeoffs

2018 state code · One log per bid · Remote

A Charlotte bid list stays on the 2018 North Carolina code until the state page gives the 2024 book a date

Support for a list of bids around Charlotte is remote. There is no seat in the city. Each invitation is logged on its own: the city on the cover, the code edition that cover cites, and the sheets that arrived. The Office of the State Fire Marshal’s current-codes page still lists the 2018 North Carolina codes, effective 1 January 2019 and based on the 2015 I-Codes, as the codes in effect. The 2024 edition is discussed on that page and is not given an effective date there. A set is not repriced onto 2024 because a bidder hopes the hold has ended.

North Carolina applies that state code through local inspection departments and does not let a city invent a different model code. This page does not name a Charlotte counter beyond that state structure, because a department title was not confirmed for this batch. Concord and Gastonia are inside the wage survey and are different places. A South Carolina sheet in the same PDF is a different state. It is flagged, not measured as North Carolina.

File OEUM001674000000013105103 places Cost Estimators at $38.88 an hour. The survey name is Charlotte-Concord-Gastonia, NC-SC. The occupation estimates. It is not a trade crew. Dollars in a trade column come from rates you provide. The January 2023 chart does not list a North Carolina prevailing-wage law. Federal assistance can still attach a determination. Preparing the estimate is its own quote.

Coastal wind and flood criteria are an eastern problem. Piedmont drawings follow the loads printed on those sheets. They are not given a beach opening package. Alternates sit on separate pages. A contingency figure is one you set.

A school invitation and a private office on the same afternoon do not share a labor basis. Only the solicitation that attaches a determination gets one. Self-perform and subcontract splits follow what you say about your own crews.

A shell and a later tenant package in one file are identified before they are priced. If the set never draws the line between them, that gap is listed. It is not decided here.

Pass the bid list and the first plan set. No pre-bid walk is attended.

A light-rail adjacent shoring note is a general-requirement item only when the invitation describes the lane closure. A data-hall fit-out is not priced as ordinary office. Generator yards shown only on a civil key plan stay out until an electrical sheet dimensions them.

A Piedmont school and a private warehouse on the same afternoon do not share a labor basis. Only the solicitation that attaches a federal determination gets one. Light-gauge stairs in a tenant suite stay with the suite. A generator yard shown as a dashed future is excluded. Rock unit prices are left blank until you supply a price.

Bid support before pricing Charlotte on an undated 2024 code

Charlotte bid-list questions the code hold creates

Should new Charlotte bids use the 2024 state code?

Not from the current-codes page. That page still lists the 2018 codes, effective 1 January 2019, as the ones in effect, and it does not give the 2024 book a date.

Does the wage survey make a Rock Hill sheet a Charlotte sheet?

No. The survey crosses into South Carolina. A South Carolina parcel is flagged. It is not measured under the North Carolina code.

Is $38.88 the fee?

No. File OEUM001674000000013105103 is the survey hourly statistic for Cost Estimators. The fee is quoted separately.

Charlotte estimator references

Pass the Charlotte bid list and the first set

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.