F&K Estimatings Construction Estimating & Takeoffs

United Kingdom tender estimating

UK Quantity Takeoff and Bill of Quantities Checking Services

UK tenders still turn on measured bills, quantified schedules and subcontract packages that must follow the named method of measurement. F&K prepares remote quantity takeoffs and bill checks in pounds sterling for main contractors and trade subcontractors, without claiming to be a RICS-regulated surveying practice. The written quote confirms trades, workbook format and return timing before measuring starts.

Remote estimating for United Kingdom projects. This page does not represent a local office.

Updated · F&K estimating methodology

NRM2 and SMM7 are not interchangeable on a live bill

NRM 2 second edition is the current RICS detailed measurement guidance for building works, while many older bills and price libraries still follow SMM7. The same wall can be measured differently under each rule set. F&K follows the method named in your tender documents and notes assumptions where the method is silent, instead of silently modernising an SMM7 bill into NRM language.

VAT domestic reverse charge rules since March 2021 change how construction services are presented between VAT-registered parties. The workbook shows VAT separately and does not decide whether reverse charge applies to your supply. Building regulations references are taken from the documents for England, Wales, Scotland or Northern Ireland as cited, without compliance certification from F&K.

What the takeoff can include

Measured takeoff from drawings

Produce quantities for the trades you are pricing, with drawing revision references on each sheet and clear exclusions for works outside the package.

Employer bill cross-check

Compare issued bill items to drawings and report missing, duplicated or superseded quantities by reference for tender queries.

Subcontract package measurement

Limit measurement to the package drawings issued by the main contractor when you are a trade bidder, listing interfaces that appear to sit elsewhere.

Preliminaries boundary notes

Flag items that appear to sit in preliminaries or another trade so they are not priced twice or missed between packages.

Measurement and scope checks

Intake confirms site nation within the UK, contract form, measurement method, return date and GBP pricing basis. Refurbishment jobs get an existing-versus-new register before measurement. Clarifications are listed instead of guessed. F&K does not certify Building Regulations compliance or provide legal advice on JCT or NEC risk clauses.

Illustrative school refurbishment bill query

A quantified schedule for classroom refurbishment conflicts with the latest survey drawings.

Illustrative school refurbishment bill query
Bill itemBill quantityDrawing check
Classroom carpet420 m²Survey shows 390 m² after cupboards retained; 30 m² query.
Whiteboard walls12 roomsTwo rooms marked existing writeable walls; supply count 10.
Ceiling tilesCorridor provisionalProvisional retained; access panel count added from RCP.

Illustrative education refurbishment only. Asbestos and condition surveys can remove or add scope before pricing.

Deliverable, pricing basis and quote

Deliverables are editable workbooks with quantities, queries and assumptions in GBP terms. Typical turnaround is 24–48 hours from a complete package. The written quote states trades, whether bill checking is included, and that RICS certification stays with your own QS if required. Revision rounds after addenda reprice only the affected lines.

Explore our full quantity takeoff services scope

Questions about this scope

Do you measure to NRM2 by default?

We measure to the method your tender names. If none is named, assumptions are listed for your estimator to adjust.

Are you chartered surveyors?

No. F&K is a remote US estimating team. Certified QS services remain with your own practice when required.

Can you price small drylining packages?

Yes. Many UK enquiries are single-trade packages from a main contractor.

Official project references

Send your United Kingdom tender documents

  • Drawings, specification, surveys and any bill or schedule of works.
  • Contract form and measurement method statement.
  • Trade package limits if you are a subcontractor.
  • Return date/time and GBP pricing basis if rates are required.
Other estimating support for United Kingdom

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

    Share Service: