United Kingdom tender estimating
Commercial Estimating Services for UK Refurbishment and Fit-Out Bids
UK commercial tenders — especially refurbishment and CAT-A/CAT-B fit-outs — are decided by what is retained, stripped and remade. F&K prepares remote commercial estimates in GBP that separate strip-out, making good and new works so preliminaries and trade quotes compare against the same measured story.
Remote estimating for United Kingdom projects. This page does not represent a local office.
Updated · F&K estimating methodology
Existing fabric is the commercial risk register
A schedule of works that says renew ceilings without a survey-backed retention schedule invites double counting of retained grids and missed making good. F&K builds an existing-versus-new register from the survey drawings before measuring new supply. Asbestos registers and condition surveys, when present, constrain what can be measured as ordinary strip-out.
JCT and NEC forms allocate ground risk, change mechanisms and preliminary responsibilities differently. The commercial workbook measures to the documents and flags clauses that appear to move quantity risk onto the bidder, without giving legal advice. Out-of-hours working in occupied offices is listed when the employer requires it.
What the takeoff can include
Strip-out and protection
Measure selective removals and temporary protection by floor and zone, keeping retained finishes identifiable.
New fit-out works
Quantify partitions, ceilings, finishes and joinery from the fit-out package with rating notes where relevant.
Services within the commercial package
Include MEP items that belong to the commercial return, with landlord interfaces flagged line by line.
Preliminaries-sensitive items
Call out temporary works and out-of-hours requirements that affect commercial pricing assumptions.
Measurement and scope checks
Commercial estimating begins with drawing-issue control and a retention register. Measured sections follow NRM2 or the named method when a bill is present. GBP rates come from your supply chain. VAT is shown separately; reverse-charge treatment is not decided by F&K. Open items stay visible until the design team answers, and no silent allowance is inserted to close a gap. Open items stay visible until the design team answers, and no silent allowance is inserted to close a gap. Open items stay visible until the design team answers, and no silent allowance is inserted to close a gap. Open items stay visible until the design team answers, and no silent allowance is inserted to close a gap.
Illustrative CAT-B office floor commercial split
One office floor keeps the landlord CAT-A ceiling grid and renews partitions.
| Element | Survey cue | Workbook line |
|---|---|---|
| Ceiling grid | Marked existing | Excluded from new supply; decoration to grid listed if specified. |
| New cellular partitions | 14 offices | Partition area by type and acoustic rating. |
| Making good to carpets | Door moves | Patch areas measured apart from full-floor carpet renewal. |
Illustrative fit-out only. Landlord manuals can move ceiling and services responsibility.
Deliverable, pricing basis and quote
Commercial workbooks can be quantities-only or priced in GBP. The quote confirms floors, trades and whether bill checking is included. Typical delivery is 24–48 hours from a complete commercial package. Addenda reprice only changed lines once the revision fee is agreed.
Explore our full commercial estimating services scopeQuestions about this scope
Can you estimate a single CAT-B floor?
Yes. Package limits are normal for UK commercial work.
Do you include FF&E?
Only when the documents and quote place FF&E in scope.
How do you treat retained landlord services?
They are excluded from new supply and listed as interfaces when shown as existing.
Official project references
- GOV.UK guidance on the VAT domestic reverse charge for construction
Relevant to tender price presentation between VAT-registered construction parties.