F&K Estimatings Construction Estimating & Takeoffs

Dubai & UAE tender estimating

Commercial Estimating Services for Dubai and UAE Fit-Out Contractors

Commercial tenders in the Emirates are usually fit-out races: short tender periods, dense finish schedules and a work letter that decides who pays for demolitions, ceilings and mechanical terminals. F&K prepares remote commercial estimates and measured packages for contractors bidding those jobs in AED, starting with a written quote that names the included floors, trades and delivery date.

Remote estimating for United Arab Emirates projects. This page does not represent a local office.

Updated · F&K estimating methodology

Price the tenancy, not a generic square-metre allowance

A mall unit, a hotel guest-floor refurbishment and an office CAT-B package do not share the same commercial risk profile. Mall units often inherit landlord air terminals and fire services; hotel floors multiply FF&E interfaces; office jobs hinge on acoustic partitions and raised-floor interfaces. Folding those differences into one dirham-per-metre rate hides the items that decide whether the bid is complete.

Dubai and Abu Dhabi also sit under different building regimes. Dubai Municipality's Dubai Building Code and Abu Dhabi's International Building Code with Estidama Pearl requirements change envelope and services documentation. The estimate records which regime the tender cites instead of assuming one Emirate-wide rulebook. Permit steps such as DDA fit-out permits or mainland decoration permits are noted as process context, not as services F&K performs.

What the takeoff can include

Strip-out and enabling

Separate demolition, protection and making good by zone so retained finishes are not priced as new supply.

Partitions, ceilings and finishes

Measure wall types, ceiling types and floor finishes from schedules, keeping acoustic and fire-rated assemblies on their own lines.

Services within the fit-out

Carry HVAC terminals, electrical devices, plumbing fixtures and controls that belong to the tenant package, with base-building interfaces flagged.

Preliminaries and allowances

List mobilisation, out-of-hours working and provisional items separately when the commercial return needs them visible for comparison.

Measurement and scope checks

We map the work letter first, then measure by floor and tenancy. Each commercial section of the workbook cites the drawing issue used. Alternates and value-engineering options stay outside the base total until you ask for them to be priced. AED rates come from your suppliers or agreed unit rates; F&K does not invent UAE market rates.

Illustrative hotel floor commercial rollup

Assume twelve guest rooms and a corridor on one hotel floor. The table shows how finishes and terminals stay separable for pricing.

Illustrative hotel floor commercial rollup
PackageExample inputWorkbook entry
Guest-room carpet12 rooms × 28 m²336 m² carpet, underlay and transitions listed apart.
Corridor ceiling1 × 94 m² acoustic tile94 m² ceiling with access panels counted separately.
Fan-coil reconnections15 FCUs on layout, 4 retained11 new connections; 4 reuse lines kept out of new supply.

Illustrative only. Actual hotel brands and operator manuals can move FF&E and MEP responsibility; those instructions override this example.

Deliverable, pricing basis and quote

Choose a quantities-only commercial workbook or a priced AED estimate. Either way the quote states floors covered, trade list, exclusions and delivery timing. Typical turnaround is 24–48 hours once drawings, schedules and the work letter are complete. Revisions after addenda reprice only the changed lines.

Explore our full commercial estimating services scope

Questions about this scope

Can you estimate only one hotel floor or retail unit?

Yes. Many UAE commercial enquiries are single-tenancy packages. Send the drawings for that package and we measure only the agreed floors and trades.

Do you include FF&E supply?

Only when the documents and written quote put FF&E in scope. Operator-supplied items are flagged so they are not buried inside builder works.

Can Abu Dhabi Estidama items appear in the estimate?

Where the tender cites Estidama requirements that affect measured scope, those lines are identified. F&K does not certify Pearl ratings.

Official project references

Send your Dubai & UAE tender documents

  • Architectural, reflected ceiling and services drawings for the commercial package.
  • Finish schedules, FF&E matrix if issued, and the landlord work letter.
  • Current BOQ or pricing schedule if the tender uses one.
  • Emirate, building name, tender close time and AED rate basis if pricing is required.
Other estimating support for Dubai & UAE

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

    Share Service: