Structural Steel Estimating for Saudi Industrial and Building Lots
Steel packages on Saudi industrial tenders mix fabrication tonnes, connection counts, deck area and erection logistics. F&K prepares remote structural steel estimates that keep those layers visible in SAR so a fabricator's quote and an erector's quote are not compared against different hidden scopes.
Remote estimating for Saudi Arabia projects. This page does not represent a local office.
Updated ยท F&K estimating methodology
Fabrication weight is not an erection bid
A tonne total that swallows connections, paint, freight and temporary bracing cannot explain bid spreads. Saudi industrial lots often repeat frames across warehouses while changing crane beams or mezzanines on only one building. Those deltas must stay explicit. Coatings and fire protection may sit with steel or with another trade; the workbook records the tender assignment instead of guessing.
Owner-furnished steel or nominated fabricators change what the bidder actually carries. F&K flags free-issue members and measures only the installation, connections or remaining supply stated in the documents. International freight into Kingdom ports is never invented as a percentage without your quotation basis.
What the takeoff can include
Main members and bracing
List shapes, lengths and weight basis by building lot, including crane beams and mezzanine steel when shown.
Connections and miscellaneous metals
Count typical connections, base plates and misc metals so connection allowances are not double-counted.
Deck and secondary steel
Measure metal deck area and secondary members apart from primary frame weight.
Coatings and erection assumptions
Identify paint or galvanising scope and erection exclusions as separate assumption lines.
Measurement and scope checks
Steel takeoff starts with a member schedule cross-check against plans. Weight, connection count and deck area stay in different columns. Lot tags prevent Warehouse C from inheriting Warehouse A's crane-beam tonnage after a silent copy. SAR pricing maps fabricator and erector quotations onto those columns. The workbook also records open clarifications so a missing detail does not silently become a firm quantity. Where freight, customs or mobilisation affect industrial cash flow more than measured units, those cost inputs stay outside the quantity columns until you provide a quotation basis.
Illustrative repeated frame with crane-beam delta
Three warehouse frames share geometry; only one adds runway beams.
| Lot | Frame steel | Delta treatment |
|---|---|---|
| Warehouse A | 182 t primary + bracing | Base repeated frame. |
| Warehouse B | 182 t primary + bracing | Identical repetition tag. |
| Warehouse C | 182 t + 14 t runway beams | 14 t listed as C-only delta with connection extras. |
Illustrative tonnages only. Shop drawings, bolt lists and erection engineering remain outside standard estimating unless agreed.
Deliverable, pricing basis and quote
Steel workbooks can support fabricator RFQs, erection bids or GC comparisons. The written quote states coating scope, whether deck is included and the SAR pricing basis. Typical turnaround is 24โ48 hours from a complete structural steel set. Revision rounds after addenda reprice only the affected lines, and the fee for those rounds is confirmed before remeasurement starts.
Explore our full structural steel estimating scopeQuestions about this scope
Can you exclude erection and measure supply only?
Yes. The quote can limit the workbook to fabrication quantities while erection assumptions stay as exclusions.
Do you engineer connections?
No. Connection design and shop detailing stay with the steel detailer or engineer of record.
How are joists handled?
Joists and joist girders are listed apart from structural steel shapes when the documents show them, including seat and bridging counts where specified.
Can the workbook stay quantities-only through tender?
Yes. Many bid teams apply their own rates locally. Quantities-only delivery still includes assumptions, drawing references and an addenda log.
Official project references
- Balady โ Issuing a Building Permit
Structural permit issue sets the drawing baseline for measurement after comments are closed.