Saudi Arabia tender estimating
Saudi Arabia BOQ and Quantity Takeoff Services for Multi-Lot Tenders
Saudi tenders rarely arrive as one building. Warehouses, plant rooms, gatehouses and shared yard works arrive as lots that must stay separable through every addendum. F&K prepares remote quantity takeoffs and BOQ reconciliations in Saudi riyals for contractors who need lot-clean measurement before pricing, without claiming a Kingdom office or Saudi QS licence.
Remote estimating for Saudi Arabia projects. This page does not represent a local office.
Updated ยท F&K estimating methodology
Keep employer BOQ coding intact across lots and revisions
Etimad and large private programmes often issue bills with employer item codes that must survive drawing revisions. If a takeoff renumbers everything into an estimator's private template, bid leveling against the employer's form becomes guesswork. F&K preserves the issued coding, then attaches drawing references and lot tags so a Tabuk release does not inherit a Riyadh rate basis by accident.
The Saudi Building Code edition stated on the permit set matters for documentation, but measurement still follows the tender's method notes. SBC 304 shapes how concrete details are read; it does not replace a bill preamble. Where Vision 2030 giga-project packages use bespoke measurement notes, those notes outrank any assumed regional default.
What the takeoff can include
Lot-separated building quantities
Measure each warehouse, plant room or ancillary building on its own lines with shared infrastructure identified once.
Civil and yard interfaces
Carry trenches, paving and external services against the site package without double-counting building tie-ins.
Addenda comparison
Isolate every revision against base quantities so the bid team can see scope movement separately from rate movement.
Allowances and alternates
Keep provisional sums, mobilisation and alternate materials visible for review before SAR rates are applied.
Measurement and scope checks
Intake records city or site, lot list, submission deadline with time zone and the SAR pricing basis. Measurement starts from the drawing issue register. Shared yard work is reconciled to one lot and cross-checked against the tender total so it is not repeated under every building.
Illustrative three-lot Saudi quantity split
A logistics tender with two warehouses and a shared trench shows why lot tags matter before pricing.
| Lot | Measured item | Workbook treatment |
|---|---|---|
| Warehouse A | 11 equipment pads | Pads tagged to A only; inserts flagged if supplier-furnished. |
| Warehouse B | 7 equipment pads | Counted separately even when pad geometry matches A. |
| Site package | 180 m common trench | Carried once, then reconciled to the bill total. |
Illustrative programme logic only. Actual Vision 2030 or private logistics packages may use different lot definitions.
Deliverable, pricing basis and quote
You receive an SAR-ready workbook by lot with assumptions and an addenda log. Quantities-only or priced options are available; VAT at 15 percent stays on a summary line. The written quote confirms packages, fee and typical 24โ48 hour delivery after a complete set arrives.
Explore our full quantity takeoff services scopeQuestions about this scope
Do you publish SAR per-square-metre rates?
No. Rates come from your quotations or agreed unit rates. Statistical construction cost indices are not used as bid rates.
Can lots in different regions share one rate table?
Only if you instruct that. Otherwise each lot keeps its own visible rate basis because regional input costs differ.
Are you licensed in Saudi Arabia?
No. F&K is a remote US estimating team. Permit and licence obligations stay with the contractor and design office.
Official project references
- Balady โ Issuing a Building Permit
Permit process context. Measurement follows the tender documents and stated Saudi Building Code edition.