Qatar tender estimating
Qatar BOQ and Quantity Takeoff Services for Tender Packages
Qatar public and private tenders expect quantities mapped to the employer's bill items with drawing references that survive circulars. F&K prepares remote BOQ takeoffs and reconciliations in Qatari riyals for contractors bidding Ashghal and related packages, starting with a written quote before any measuring begins.
Remote estimating for Qatar projects. This page does not represent a local office.
Updated · F&K estimating methodology
Ashghal circulars can rewrite a bill overnight
Ashghal publishes tenders through its e-tendering channel and related procurement routes. Submissions are time-critical, with editable and scanned BOQ requirements common on public work. A takeoff that cannot absorb a tender circular without rebuilding the whole workbook will miss the close. F&K keeps base quantities stable and remeasures only circular-affected lines.
QCS 2014 is the national specification backdrop for materials and workmanship, while Interim Advice Notes may tighten particular topics such as hot-weather concreting. Specification is not automatically a method of measurement. The workbook follows the bill's stated rules — POMI-style, CESMM or project notes — and claims no standard the tender omits.
What the takeoff can include
Employer bill mapping
Attach measured quantities to issued bill item numbers with drawing references on each line.
Civil and utilities quantities
Measure alignments, trenches, chambers and reinstatement by chainage or zone when those packages are included.
Building and MEP quantities
Carry architectural, structural and services takeoffs against the same bill structure the tender uses.
Circular and addendum control
Log each circular against changed quantities so estimators can see official clarifications quickly.
Measurement and scope checks
Intake captures tender number, Doha-time closing deadline, measurement notes and QAR pricing instructions. We measure from the purchased document set, not from marketing summaries. FIDIC remeasurement context is noted when relevant, but the workbook remains a tender estimating deliverable rather than a contract administration tool. The workbook also records open clarifications so a missing detail does not silently become a firm quantity. Where freight, customs or mobilisation affect industrial cash flow more than measured units, those cost inputs stay outside the quantity columns until you provide a quotation basis.
Illustrative utility circular impact
A road-crossing detail arrives in a tender circular after the base trench was measured.
| Item | Base takeoff | After circular |
|---|---|---|
| Open trench | 640 m | 610 m; 30 m converted to crossing detail. |
| Sleeved crossing | Not on base bill | 30 m sleeves, bedding and pavement reinstatement added. |
| Traffic control | Provisional | Still provisional; responsibility note unchanged. |
Illustrative public-works logic only. Follow the actual Ashghal circular language on your tender.
Deliverable, pricing basis and quote
Returns are QAR workbooks aligned to employer items, with assumptions and circular logs. Priced estimates use your rates against the QR 3.64 dollar peg context you choose for conversions. Typical delivery is 24–48 hours from a complete purchased set. Revision rounds after addenda reprice only the affected lines, and the fee for those rounds is confirmed before remeasurement starts.
Explore our full quantity takeoff services scopeQuestions about this scope
Can you start from a tender notice without purchased documents?
No. Measurement needs the issued drawings and bill. Buy the documents, then send the full set with the tender number.
Do you work to QCS 2014 automatically?
QCS informs specification reading. Measurement follows the bill's named method and any Interim Advice Notes the tender cites.
Are you based in Doha?
No. F&K is remote and US-based with no Qatar office or staff.
Can the workbook stay quantities-only through tender?
Yes. Many bid teams apply their own rates locally. Quantities-only delivery still includes assumptions, drawing references and an addenda log.
Official project references
- Ashghal e-Tenders
Confirm current tender notices, fees and submission rules on the Authority's channels.