F&K Estimatings Construction Estimating & Takeoffs

2025 electrical volume · April 22 local amendments · No invented NEC year

San Diego electrical quantities follow the 2025 California Electrical Code the city named, not a guessed NEC year

Electrical work inside San Diego is reviewed by the Development Services Department. The department’s notice on the 2025 state package names a 2025 California Electrical Code for applications submitted on or after January 1, 2026. Local amendments took effect April 22, 2026. That notice does not print a National Electrical Code edition year, so this page does not invent one. If the drawings name a year, the workbook copies that year. If they do not, the year stays blank.

Branch circuits, feeders, and service gear are separate. Lighting fixtures are counts from the lighting plan, by type. Devices are counts from the power plan. Conduit and wire are extended only where the riser or the homerun notes give a size and a route. A missing homerun is a gap, not a typical length borrowed from another floor. Gear is taken from the one-line and the panel schedules. A panel schedule that does not match the one-line is written down as a clash.

Photovoltaic modules, inverters, and battery cabinets are counts when those sheets are in the set. They are not added because the region is sunny. Electric-vehicle spaces are counts from the site or garage plan. Low-voltage, fire alarm, and telecom stay out unless this contract holds them. Temporary power for construction is a means item only if you ask for it.

Electricians in San Diego-Chula Vista-Carlsbad are published at $39.54 an hour on file OEUM004174000000047211103. The survey area includes cities this department does not review. The figure is not a feeder price and not a city crew rate. A covered public job uses the wage determination in that contract. A private tenant build-out does not inherit it.

Seismic bracing of equipment and of conduit is counted where the structural or electrical notes draw the braces. It is not a percentage of gear cost. Lighting controls required by the energy sheets are counted from the control diagrams. A diagram that was never attached leaves the control count open.

Forward the one-line, the panel schedules, the lighting plan, and the power plan. No panel is opened.

Site lighting on poles is a count of poles plus the fixture head, kept apart from the interior lighting plan. A generator yard is equipment plus the feeder the site electrical plan dimensions. Corrosion notes for coastal gear are copied from the spec. They do not add a coating the spec never required. Parking-garage exhaust fans that need power are flagged so the mechanical count and the electrical count do not both purchase the fan.

Electrical quantities before assigning San Diego an NEC year

San Diego electrical questions the notice leaves open

Which NEC year does San Diego enforce?

The Development Services notice names the 2025 California Electrical Code and does not print an NEC year. The workbook uses the year on the drawings, or leaves it blank.

Do you add solar because the site is in San Diego?

No. Modules and inverters are counted only from the sheets that show them.

Is $39.54 a price per foot of conduit?

No. File OEUM004174000000047211103 is the metro hourly figure for Electricians.

San Diego electrical references

Forward the San Diego one-line and panel schedules

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.