F&K Estimatings Construction Estimating & Takeoffs

Dallas, Texas · Remote estimating support

Plan Review Services in Dallas, TX

Send F&K Estimatings your Dallas drawing set and we review it before anyone prices it: missing sheets, clashes between disciplines, scope both trades assume, and details that would surface as change orders. You get an issue log with suggested clarification questions. F&K is an estimating service, not a licensed engineer and not a permit expeditor; design decisions and permit approval stay with the professionals and the City. Fee and delivery date are quoted in writing once the documents arrive.

Send plans for a scope quote

Project context and local references

Dallas permits run through the City's Development Services department, whose Building Inspection division administers the construction codes. The city enforces the 2021 International Code Council editions — Building in Chapter 53, Plumbing in 54, Mechanical in 55, Residential in 57, Existing Building in 58 — in force since May 12, 2023, with the 2021 Fire Code in Chapter 16 effective February 10, 2023 and the 2021 energy code alongside. Electrical work follows a newer cycle: the Council adopted the 2023 National Electrical Code as Chapter 56 on April 23, 2025, effective May 23, 2025, and the City's letter to contractors flags two items a reviewer should catch — surge protection on feeders supplying dwellings (NEC 215.18) and an emergency disconnect when service equipment is replaced (230.85(C)). Since September 1, 2026 the state electrical code is the 2026 NEC (TDLR, 16 TAC §73.100); work inside city limits is subject to the city's adopted edition, so a reviewer should confirm which edition the permit set was drawn to. The Bureau of Labor Statistics puts cost estimators in the Dallas–Fort Worth–Arlington area at $41.89 an hour on average in May 2025 (OEWS series OEUM001910000000013105103). Census permit data for 2025 shows Dallas authorised 6,993 housing units at a combined permit valuation of $1,484.9 million: 4,883 in buildings of five or more units — close to seven in ten — against 2,026 single-unit homes, so most new plan sets here are multifamily. Much of the city sits on Blackland Prairie clays that swell and shrink with moisture, so foundation and pier details are checked against the geotechnical report rather than assumed.

check your Dallas plan set before pricing begins

Hypothetical worked example · not a client project or market quotation

Take a hypothetical 90-unit apartment set. The structural sheets show drilled piers, but the geotech report's pier depths appear on one sheet, and the electrical sheets still cite the 2020 NEC although the project is permitted under the 2023 edition. The review log records both gaps, notes the missing dwelling-feeder surge protection, and asks if the pier schedule matches the report. Catching those items early matters: at the metro estimator mean of $41.89 an hour, eight hours of re-pricing costs about $335 — a missed feeder item costs far more once the bid is in. This illustration uses public wage and permit figures, not a quotation for any real project.

Review before pricing

The review walks the sheet index against each addendum so nothing superseded is measured, then compares the code sheet's edition with the editions Dallas enforces. Structural, architectural and MEP sheets are read against each other for conflicts — a beam crossing a duct run, a panel that moved between issues — each logged with the sheets it touches and what it costs the estimate. Foundation details are matched to the geotechnical report; open items become exclusions or allowances, not silently priced lines. The log closes only when every open item has an owner: a question for the design team, an allowance with a stated basis, or a confirmed exclusion.

Documents and requested output

Send the current drawing set and specifications, all addenda issued to date, the geotechnical report where one exists, and your scope of work if you are bidding a single trade. Add the project address and the jurisdiction it sits in, the bid date, and the deliverable you want back — the issue log alone, or the log plus suggested RFI wording. Tell us which drawing issue is being priced so the review matches your bid, not an earlier set.

What to confirm before comparing bids

Read subcontractor prices against the issue log before comparing totals. A price that includes the missing surge protection and one that excludes it are not the same bid, even if the numbers look close. Every open item from the review needs an answer, an allowance with a stated basis, or an exclusion the bidder has confirmed. Level totals that still carry unresolved scope with an allowance before ranking them, so the comparison rests on the same scope.

Scope checklist

  • Current drawing set, specifications and every addendum issued to date.
  • Code sheet showing the edition the design was drawn to.
  • Geotechnical report, where foundation or pier work is in scope.
  • Project address and the Dallas jurisdiction it sits in.
  • Your scope of work and the bid date.
  • The drawing issue being priced, so the review matches your bid.
  • Any permit comments or review letters that change scope.

Source documents for project review

Local references checked . Confirm the current requirements with the project team and relevant authority.

Questions for this estimating scope

What information helps us check your Dallas plan set before pricing begins?

Send the current drawing set and specifications, all addenda issued to date, the geotechnical report where one exists, and your scope of work if you are bidding a single trade. Add the project address and the jurisdiction it sits in, the bid date, and the deliverable you want back — the issue log alone, or the log plus suggested RFI wording. Tell us which drawing issue is being priced so the review matches your bid, not an earlier set.

What needs review before this scope is priced?

The review walks the sheet index against each addendum so nothing superseded is measured, then compares the code sheet's edition with the editions Dallas enforces. Structural, architectural and MEP sheets are read against each other for conflicts — a beam crossing a duct run, a panel that moved between issues — each logged with the sheets it touches and what it costs the estimate. Foundation details are matched to the geotechnical report; open items become exclusions or allowances, not silently priced lines. The log closes only when every open item has an owner: a question for the design team, an allowance with a stated basis, or a confirmed exclusion.

Discuss your Dallas project scope

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.